Thirteen reports, each for a named reader
Every Ingro EMS issues these reports from your plant's own records, as A4 PDF with the data in XLSX, on schedule. Here is what each one covers and why it matters.
Financial & executive
Electricity bill reconciliation, peak demand shaving, diesel offset & ROI
- 01
Monthly commercial & savings statement
What did the plant save us this month, and where did the money come from?
Reconciled electricity bill, peak demand shaving, diesel offset & net ₹ savings
Monthlyfor owner, financeWhat's inside - 02
Energy savings measurement & verification (M&V)
Can our savings stand up to a lender, an ESCO contract or an auditor?
Statistically verified energy savings against the baseline & model confidence; excludes demand charges
Monthly, annualIPMVP Option C · ASHRAE 14for finance, lender, escoWhat's inside - 03
Annual asset & performance review
How did the asset perform over the year, and is it on track for payback?
Year-on-year savings, project payback & availability guarantee
AnnualASHRAE Guideline 14for owner, lender, insurerWhat's inside - 04
Energy accounting & tariff settlement
Is our electricity bill right?
kVAh & ToU billing reconciliation against utility DISCOM invoice
MonthlyMSEDCL HT-I tarifffor finance, utilityWhat's inside
Plant operations
Power continuity, daily operations brief, solar yield & battery health
- 05
Daily operations brief
How did the plant do yesterday, and what needs attention today?
Yesterday's 24-hour plant performance scorecard & today's dispatch plan
Dailyfor plant managementWhat's inside - 06
Power continuity & grid resilience
How reliable was our power supply, and did backup cover every outage?
Outage log, islanding duration and downtime
MonthlyIEEE 1366for plant management, insurerWhat's inside - 07
Solar PV performance & inverter yield
Is our solar array producing what it should?
Daily specific yield (kWh/kWp), PR%, string inverter peer ranking & curtailment
MonthlyIEC 61724-1 Annex Efor o&m, epcWhat's inside - 08
Diesel generator operations & fuel displacement
How much diesel are we burning, and how much did the system avoid?
Diesel offset, fuel runway, starts & engine loading
MonthlyIEEE 762for o&m, financeWhat's inside - 09
BESS health & warranty tracking
Is the battery ageing as expected, and is the warranty still intact?
State of health (SoH), cycling cadence, RTE & OEM warranty runway
Monthly, annualfor o&m, lender, supplierWhat's inside
Safety, audit & ESG
ISA-18.2 safety alarms, dispatch fidelity, BRSR carbon & data audit
- 10
Safety alarms & incident digest
Is the plant operating safely, and are alarms being handled well?
ISA-18.2 trip events, standing safety alerts & nuisance alarm ranking
Monthly, annualISA-18.2 · NFPA 855for plant management, hseWhat's inside - 11
Dispatch & autonomous control audit
Did the control system do what it said, and who changed what?
Dispatch decisions, setpoint adherence & operator overrides
Quarterly, on requestfor engineeringWhat's inside - 12
Carbon emissions & ESG disclosures
What are our energy emissions, and what did the plant avoid?
Scope 1 (diesel) & Scope 2 (grid) avoided emissions and green energy fraction
AnnualGHG Protocol · BRSRfor finance, corporate reportingWhat's inside - 13
Data integrity & audit provenance
Can we trust the numbers in the other twelve reports?
Meter coverage, telemetry health, modelled days & assumptions register
Monthlyfor auditWhat's inside