Ingro EMS-GS · Energy management system

Grid-Scale BESS EMS

Execute dispatch and grid-code response at the substation, and keep the availability and battery-health records a tender is paid on.

Works with: Containers + substation · plant-level control

ingroingroingroingroingroingroingroingroingro12Ingro EMS-GS34
The question buyers ask

What must the EMS of a tendered standalone BESS do to meet its availability and grid-code obligations in India?

It has to follow the buying entity's schedule and the dispatch centre's signals at the delivery point, and hold back enough energy to answer every scheduled block. It also has to compute availability, round-trip efficiency and cycles from the delivery-point meter, using the contract's own formulae. Ingro EMS-GS does this on a redundant controller pair at the substation, and keeps battery-health records for lenders and insurers.

The developer has bid a capacity charge under a contract that pays for capacity made available, block by block. It deducts damages linked to that charge for any shortfall and penalises round-trip efficiency below the guarantee. Alongside it sit a cell warranty with its own cycle and state-of-charge limits, grid rules adding secondary control, grid-forming and black start for larger plants, cyber-security regulations, and a commissioning date backed by liquidated damages.

Written for

Developers bidding grid-scale BESS tenders, their EPC contractors and integrators, and the owners' and lenders' engineers reviewing them

What it costs you today

  • Availability lost in energy, not power

    Availability is actual energy over scheduled energy in each block the buyer scheduled. If state of charge is short when a block arrives, it counts against the plant even with every container healthy.

  • Contract and cell warranty disagree

    The contract may let the buyer split sessions, run at reduced power or call extra cycles, and new construction standards say cooling-off periods must not limit flexible operation. The cell warranty may still cap throughput, SoC window or rest time, and the developer carries the gap.

  • Round-trip judged after auxiliaries

    Round-trip efficiency is settled monthly at the meter, with the auxiliary load counted inside it. In an Indian summer the cooling load can turn a datasheet efficiency into a monthly penalty.

  • Grid approvals on the critical path

    Substation automation approval, SCADA integration and telemetry must all be in service before the trial run counts. Developers have been refused extensions and handed liquidated damages when these slipped.

How it works

How does EMS-GS execute a dispatch schedule and prove it?

A tendered storage plant is paid against contracted availability. EMS-GS follows the operator's schedule, responds as the connection agreement requires, and records every instruction and response as evidence.

Scheduled dispatch

Illustrative. Not measured data.

Battery state of charge
NightMorningMiddayEveningNight
  • The operator's schedule
  • Discharging to the grid
  • Charging from the grid

The dashed line is the operator's schedule: charge, discharge, charge, discharge. The plant follows it block by block, and each block is recorded with any deviation.

What the controller answers to

  1. 1The dispatch scheduleExecuted as instructed; deviations recorded in the operator's format and timing.
  2. 2Availability and cyclesRecorded and evidenced monthly against the contracted values.
  3. 3Battery healthState-of-health and warranty records kept for lenders and insurers.
What it does for the business

The Outcomes EMS-GS Delivers

  1. Dispatch executed and recorded

    Dispatch instructions executed and deviations recorded to the operator's format and timing.

  2. Grid-code response

    Frequency and reactive power response as required by the connection agreement.

  3. Availability evidenced monthly

    Availability and cycle counts recorded and evidenced monthly against the contracted values.

  4. Health and warranty records

    Battery state-of-health and warranty records maintained for lenders and insurers.

Want an engineer to call you?

Leave your details. An Ingro engineer gets back to you within one business day, no obligation.

Or tell us about your site ↓
Product + service

What Comes With Ingro EMS-GS?

The controller is half of it. The other half is the engineering that puts it on your site and keeps it right afterwards. Both are quoted as one item.

The product

ingroENERGY MANAGEMENTEMS-GS · liveIngro EMS-GSController · console · reporting
  1. 1. The controller

    Wired, configured and commissioned against your plant, and installed in the plant room. It is the component that operates the site.

  2. 2. The operator console

    A single-line representation of the actual plant with live power on every feeder, the state of each source, the alarm register, and the endurance available at the load currently being carried.

  3. 3. The mobile view

    Read-only, for management rather than operations: whether the site is sound, what it has saved, what has occurred and what is scheduled.

  4. 4. Reporting and training

    The reporting suite, generated and distributed automatically, and instruction for the personnel who will operate the plant.

The service

  1. 1The site is establishedWhat exists, what has been ordered, and the outcomes the plant is required to deliver. One schedule and one conversation.
  2. 2The equipment schedule is issuedWritten against those outcomes, so that the plant is capable of what has been asked of it.
  3. 3The plant is modelledYour asset counts, loads, tariff and load profile are run against a full simulation of the site before equipment ships, including adverse conditions. Behaviour is reviewed and revised at this stage.
  4. 4The plant is commissionedWired, configured and tested against the site's own values, with the results recorded.
  5. 5The plant is handed over and supportedPersonnel trained, the reporting suite in service, and a defined route for support thereafter.
Need the battery too? Ingro also delivers the whole system: sizing and simulation, equipment, EMS, installation, commissioning and O&M, as turnkey BESS. Already have a battery with a locked controller? Smart retrofit.

The platform in full: specifications, the thirteen reports and implementation

Common questions

EMS-GS, Answered

9 questions

It has to prove itself. A tendered storage plant is paid against contracted availability, so the controller must execute dispatch instructions and record deviations in the operator's own format and timing, deliver frequency and reactive power response to the connection agreement, and evidence availability and cycle counts monthly against the contracted values.

Requirements differ by state and by round, so we scope against the tender document rather than against the category. Send the document and we will write the scope of supply against what it actually asks for.

Yes. Ingro EMS is supplied to BESS integrators, EPC contractors and developers to go inside the storage they build. Ingro also supplied the EMS and SCADA technology on India's first grid-scale BESS, the 10 MW / 10 MWh plant at Tata Power-DDL's Rohini substation in Delhi.

Many standalone capacity contracts forbid using the contracted capacity for anything else, so on those there is little to give up. Where the contract allows other use outside the buyer's windows, the reserve floor and the cycle cost decide how much is traded. Both are settings the owner keeps.

With a record kept from day one: state of health per block, throughput against the warranty envelope, and the SoC window enforced on every cycle. Ingro EMS-GS reports these against the guarantee each month, so the cell supplier, lender and insurer all read the same figures.

From the historian and the energy ledger, not from a spreadsheet. Availability and cycle counts are recorded continuously and issued monthly, and state-of-health and warranty records are maintained alongside them, each figure carrying its basis — metered, derived or modelled — and the proportion of the period covered by data.

Tenders differ by state and by round, but they describe the same kinds of obligation: executing dispatch schedules, delivering frequency and reactive power response under the connection agreement, and evidencing availability, cycle counts and battery health against contracted values. We scope against the tender document itself.

The developer holds the availability and round-trip risk, so the EMS has to compute the contract's formulae, not just protect the DC block. A bundled EMS can work if it does that, meets any indigenous application-software clause, and is licensed to the project. Ingro EMS can also be supplied inside the integrator's scope.

The statutory regulations apply by plant size, so check the threshold against your capacity. Tender annexures can still call for the CEA cyber-security guidelines regardless of size, and grid procedures for ancillary services ask for a cyber-security undertaking. Ingro scopes against the tender document, clause by clause.

Still have a question?

Share details of your site, hardware and tariff or tender, and an engineer will answer it.

Scope EMS-GS for Your Site

Send us what you have. We return a scope of supply, an equipment schedule and an indicative programme for EMS-GS, written against the outcomes you set.

What are you looking for?

An engineer replies within one business day. Bills, drawings or data files can go in reply to that email, or to contact@ingroenergy.com. Privacy policy

Want numbers first? Simulate the site. See it on a project: India's first grid-scale BESS.