
Plant control for tendered standalone storage. Dispatch instructions are executed and deviations recorded to the operator's format and timing, with frequency and reactive power response as the connection agreement requires. Availability and cycle counts are evidenced monthly against the contracted values, and state-of-health and warranty records are maintained for lenders and insurers.
Ingro EMS-GS is a plant controller for tendered standalone battery energy storage. It executes dispatch schedules and grid-code response at the substation, and maintains the availability, cycle and battery-health records the tender requires.
Dispatch instructions are executed and deviations recorded to the operator's format and timing, with frequency and reactive power response as the connection agreement requires. Availability and cycle counts are evidenced monthly against the contracted values, and state-of-health and warranty records are maintained for lenders and insurers.
Containers + substation · plant-level control
The assets on the site, and the controller that decides between them.
The containers
as many as the tender wants
Ingro EMS
plant controller
The substation
scheduled, and metered
Tender requirements differ by state and by round. Send us the document and we will scope against it rather than against the category.
Dispatch instructions executed and deviations recorded to the operator's format and timing.
Frequency and reactive power response as required by the connection agreement.
Availability and cycle counts recorded and evidenced monthly against the contracted values.
Battery state-of-health and warranty records maintained for lenders and insurers.
It has to prove itself. A tendered storage plant is paid against contracted availability, so the controller must execute dispatch instructions and record deviations in the operator's own format and timing, deliver frequency and reactive power response to the connection agreement, and evidence availability and cycle counts monthly against the contracted values.
From the historian and the energy ledger, not from a spreadsheet. Availability and cycle counts are recorded continuously and issued monthly, and state-of-health and warranty records are maintained alongside them, each figure carrying its basis — metered, derived or modelled — and the proportion of the period covered by data.
Requirements differ by state and by round, so we scope against the tender document rather than against the category. Send the document and we will write the scope of supply against what it actually asks for.
Every configuration is delivered the same way: the controller installed and commissioned, the app, a monthly report pack for finance, lenders and auditors, and training for the operating team — all included in the delivered price.
Wired, configured and commissioned against your plant, and installed in the plant room. It is the component that operates the site.
A single-line representation of the actual plant with live power on every feeder, the state of each source, the alarm register, and the endurance available at the load currently being carried.
Read-only, for management rather than operations: whether the site is sound, what it has saved, what has occurred and what is scheduled.
The reporting suite, generated and distributed automatically, and instruction for the personnel who will operate the plant.
Site control continues with no internet connection — the controller operates the plant from the plant room.
Integrates any make of inverter, battery, converter or generator. A model not previously encountered is added as configuration.
Adding an asset is a configuration change, not new hardware.
We return a scope of supply, an equipment schedule and an indicative programme, written against the outcomes you set.
Generation, storage, standby generation and the connection, as they stand today.
Anything ordered or contractually committed; anything still open, we can specify.
The energy bill, the fuel, continuity of production, or all three, in order of priority.
Remaining, being withdrawn, or never present. This determines how much of the night storage is required to own, and how the plant is sized.