Construction standards for BESS and RE plants, with EMS requirements (2026)

  • CEA
  • 22 June 2026
  • F. No. CEA-TH-17/1/2021-TETD Division
StorageEMSBatteriesGridSolar

What it says

The CEA (Technical Standards for Construction of Electrical Plants and Electric Lines) Amendment Regulations, 2026 add standards for solar, wind and BESS, including the first statutory specification for a BESS energy management system. In force from 1 April 2027.

Key provisions

  1. Every grid-interactive BESS needs active and reactive power control, voltage and frequency response, fault ride-through, ramp-rate control and SCADA/EMS integration.
  2. A BESS of 50 MW or more also needs automatic generation control, grid-forming inverters and black-start capability.
  3. The EMS must run unattended, allow local and remote operation, and take external set-points over IEC 60870-5-104, Modbus TCP or IEC 61850.
  4. The PCS and EMS must keep 90 days of data at 1,000 samples per second or more, shared with the SLDC/RLDC and the Renewable Energy Management Centre.
  5. Minimum performance guarantee: 90% at 5 years, 80% at 10 years and 70% at 15 years, with depth of discharge of at least 80%.
  6. PCS efficiency at least 95% and AC-to-AC round-trip efficiency, auxiliaries included, at least 70%. Each module carries an RFID tag with cell type, maker and origin.

Related notifications

All notifications

What does this mean for your site?

Tell us about your site and an engineer will reply with what this rule changes for you and how to make the most of it.

What are you looking for?

An engineer replies within one business day. Bills, drawings or data files can go in reply to that email, or to contact@ingroenergy.com. Privacy policy