Installation and Operation of Meters Amendment Regulations, 2026

  • CEA
  • 1 April 2026
  • F. No. 1/12/CEA/DPM/Regulations/2025
Open accessEMSGrid

What it says

Smart meters for all consumers where a communication network exists, and the smart meter as interface meter for low-voltage open-access consumers.

Key provisions

  1. All consumers in areas with a communication network get smart meters to the relevant Indian Standard.
  2. Connections above the smart meter's rating need remotely read meters or smart meters.
  3. All advanced metering infrastructure must include prepayment and be interoperable under CEA guidelines.
  4. A class 1.0/0.5S smart meter is the interface meter for open-access consumers at 650 V or below.
  5. Above 650 V, open-access consumers have main, check and standby meters.

Related notifications

All notifications

What does this mean for your site?

Tell us about your site and an engineer will reply with what this rule changes for you and how to make the most of it.

What are you looking for?

An engineer replies within one business day. Bills, drawings or data files can go in reply to that email, or to contact@ingroenergy.com. Privacy policy