Ancillary Services Regulations, 2022

  • CERC
  • 31 January 2022
  • No. RA-14026(11)/3/2019-CERC
StorageEMSGrid

What it says

Secondary and tertiary reserve services procured through the market, open to energy storage and demand response. Most provisions in force from 5 December 2022.

Key provisions

  1. Generators, energy storage and demand response can take part, alone or aggregated, on inter-state or intra-state networks.
  2. Secondary reserve providers need two-way communication with the RLDC, metering, SCADA telemetry and at least 1 MW.
  3. Secondary reserve must respond within 30 seconds, reach full capacity within 15 minutes and hold it for 30 minutes.
  4. Tertiary reserve must deliver within 15 minutes and hold for at least 60 minutes.
  5. Reserves are activated by the NLDC through AGC or despatch signals and settled through the deviation and ancillary services pool.

Related notifications

All notifications

What does this mean for your site?

Tell us about your site and an engineer will reply with what this rule changes for you and how to make the most of it.

What are you looking for?

An engineer replies within one business day. Bills, drawings or data files can go in reply to that email, or to contact@ingroenergy.com. Privacy policy