What it says
Charges for deviating from schedule in the inter-state grid, with separate rules for wind and solar, standalone storage and co-located storage. In force from 16 September 2024.
Key provisions
- Solar and hybrid sellers' first deviation band was 10% of schedule until 31 March 2026, and 5% from 1 April 2026.
- Wind sellers' first band narrows from 15% to 10% on the same date.
- Standalone storage is charged as a general seller; in charging mode, over-drawal is treated as under-injection and the reverse.
- Solar or wind with storage at one connection point is settled as an RE seller while the plant injects, and as standalone storage when only the battery runs.
- Each generator and storage unit needs its own special energy meter; sellers at a pooling station may use a Qualified Coordinating Agency.