Industrial Energy Optimization
In testing

Two Containers, One Plant

A 2.5 MW / 10 MWh battery at JSW Energy's Pune site: two 5 MWh containers from two different makers behind one 2.5 MVA PCS. Ingro replaced the EMS, hardware and software, so the two run as one plant.

JSW EnergyPune, Maharashtra
Isometric view of the JSW Energy battery plant at Pune: a factory at the back, a grid transformer, and two 5 MWh battery containers from two different makers, both wired to a single 2.5 MVA power conversion system. The Ingro EMS cabinet talks to both containers and the PCS. A card shows each container's charge and the plant's energy-weighted state of charge, with 2.5 MVA PCS and 10 MWh of storage.EMS
Overview

The project in brief

JSW Energy's Pune site already had a battery: a legacy EMS and a first 5 MWh container. JSW then added a second 5 MWh container from a different maker. Each container came with its own BMS speaking its own protocol, and both had to sit behind the same 2.5 MVA PCS.

Ingro replaced the EMS, hardware and software. The new Ingro EMS reads both BMS protocols, works out the plant's state of charge weighted by each container's energy, and commands the single PCS as one 2.5 MW / 10 MWh plant. Either container can be taken out of service or brought back while the plant keeps running, and a container with a critical fault is isolated automatically. The legacy EMS stays on site as a backup.

2.5 MW
Power
10 MWh
Energy
2 makers
Containers
1
PCS
The challenge

The client's challenges

01

A brownfield sitea legacy EMS and a first 5 MWh container were already installed and running

02

The second 5 MWh container came from a different maker, with a BMS speaking a different protocol

03

Both containers share one 2.5 MVA PCS, so they have to be controlled as one plant, not two

04

Maintenance on one container must not stop the whole plant

05

A fault in one container must be contained before it affects the other

The Ingro solution

What we delivered

What Ingro put in place, step by step.

  1. 1

    New EMS, hardware and software

    Ingro replaced the legacy EMS with its own controller panel and software; the legacy EMS stays only as a backup

  2. 2

    Two BMS protocols, one interface

    both containers' BMS are read through one common layer, so the controller sees one battery

  3. 3

    Energy-weighted state of charge

    the plant's SoC is calculated across the containers in service, weighted by each one's energy, with power limits combined

  4. 4

    Live in-and-out of service

    either container can be taken out for maintenance or brought back while the plant runs; the PCS ramps down before a DC contactor opens

  5. 5

    Automatic fault isolation

    a critical BMS fault takes that container out of service and opens its DC contactors, and the plant can restart on the healthy container

  6. 6

    Peak shaving against the grid limit

    the EMS charges from spare grid headroom and discharges to hold the site's grid import at its cap

Results & impact

Key outcomes

One plant
Two containers from two makers behind one 2.5 MVA PCS
State of charge
Energy-weighted across the containers in service
Maintenance
One container out of service, plant keeps running
Faults
Faulty container isolated automatically
Status
In testing
Technology

What it runs on

  • Ingro EMS controller panel
  • Ingro EMS software
  • Two BMS protocols behind one interface
  • Modbus TCP to PCS, BMS, meters and breakers
  • On-site historian and operator HMI

Got a Similar Project?

Tell us about your site and we will show how the approach used on Two Containers, One Plant would apply to it.

What are you looking for?

An engineer replies within one business day. Bills, drawings or data files can go in reply to that email, or to contact@ingroenergy.com. Privacy policy