Industrial Energy Optimization

Manufacturing Energy Intelligence

Energy analysis and BESS feasibility for Spark Minda Group, leveraging Digital Twin and Battery AI to identify cost reduction across high-consumption manufacturing processes at one of India's largest automotive component manufacturers.

Minda Industries LimitedIndia
Isometric view of a Spark Minda manufacturing site: a machining shed, a die-casting shed with a stack and an assembly hall sit under a translucent digital twin layer. A dashed outline marks where the study sized a battery. A card shows three shifts pushing against a demand limit, and demand charges at 30-40% of the electricity bill.
Overview

The project in brief

Minda Industries (Spark Minda Group), one of India's largest automotive component manufacturers with a global presence across 70+ manufacturing plants, engaged Ingro Energy for energy analysis and BESS feasibility assessment at their manufacturing facilities. The project focuses on leveraging Ingro's Digital Twin and Battery AI capabilities to identify energy cost reduction opportunities across high-consumption manufacturing processes, precision machining, die casting, surface treatment, and assembly operations.

70+
Plants
Demand
Focus
Real-Time
Analytics
Phased
Roadmap
The challenge

The client's challenges

01

Multi-shift load complexity2-3 shifts with different product lines creating overlapping, hard-to-predict load patterns

02

Demand charge dominanceMaximum demand charges constituting 30-40% of electricity bill

03

Power quality sensitivityPrecision machining and automated assembly requiring clean, stable power

04

Distributed facility challengeMultiple units with different profiles, connections, and tariff structures

05

Sustainability targetsAutomotive OEMs requiring Tier-1 suppliers to demonstrate carbon reduction

The Ingro solution

What we delivered

What Ingro put in place, step by step.

  1. 1

    Plant Energy Audit

    Comprehensive analysis identifying peak contributors, idle losses, shift variations, and power quality issues

  2. 2

    Digital Twin Modeling

    Dynamic replica of the electrical distribution network for BESS integration and demand limiting simulations

  3. 3

    BESS Feasibility Study

    Behind-the-meter configurations for demand management, power quality, and tariff arbitrage with ROI projections

  4. 4

    Energy Analytics Dashboard

    Real-time monitoring correlating energy KPIs with production output across lines and shifts

  5. 5

    Sustainability Roadmap

    Phased approach from demand management to integrated RE + BESS solutions

Results & impact

Key outcomes

Analysis Scope
Multi-process manufacturing load profiling
Digital Twin
Facility electrical network modeled
BESS Feasibility
Demand management + power quality study
Analytics
Real-time energy KPI dashboard designed
Sustainability
Phased carbon reduction roadmap

Got a Similar Project?

Tell us about your site and we will show how the approach used on Manufacturing Energy Intelligence would apply to it.

What are you looking for?

An engineer replies within one business day. Bills, drawings or data files can go in reply to that email, or to contact@ingroenergy.com. Privacy policy