CLN Energy 3 MWh BESS Solution
- Directory
- Equipment
- BESS containers
- 3 MWh BESS Solution
Listed A–Z, not ranked · Reviewed November 2026
BESS containers by CLN Energy
Specifications
As printed in the spec page, checked November 2026 (the date we compared these figures with the maker's sheet). NA means not published.
Rating
- Rated energy
- 3340 kWh
- Rated power
- 1600 kW
- Charge/discharge rate
- 0.5 P
- Duration
- 2.1 h
- PCS included
- Yes
- Cooling
- Liquid
Battery
- Cell capacity
- 314 Ah
- Chemistry
- LFP
- DC voltage range
- 1164.8–1476.8 V
- Cycle life
- NA
Electrical
- AC voltage
- 690 V
- AC frequency
- 50/60
- Round-trip efficiency
- NA
- Efficiency measured
- NA
Physical
- Size (mm)
- 6058 × 2438 × 2896 mm (axes not stated)
- Weight
- 30000 kg
- Enclosure rating
- IP54
Environment
- Operating temperature
- -30–55 °C
- Max altitude
- 2000 m
Safety
- Fire suppression
- Heptafluoropropane / Perfluorohexanone / Aerosol + gas detection + explosion-proof ventilation
- Certifications
- IEC 62619, UL 1973, UL 9540A, UN 38.3, UL 1741, EN 50549, VDE 4110, GB/T 34120, GB/T 36547
- Size:
- 1600 kW
- , 3354 kWh
- , 1600 kW / 3354 kWh
- Model code:
- BESS-3340-0.5C
- Checked:
- November 2026, against the spec page
Full datasheet
Every row the maker prints, copied as written, read 2026-11-15.
Overview
- Model code
- BESS-3340-0.5C
- Product line
- Grid and Utility · Energy Storage Systems
- Description
- CLN Energy’s Microgrid Solution—also known as a distributed energy island system—seamlessly integrates local power generation, energy storage, photovoltaic (PV) systems, and smart load control into a unified, self-reliant power network. Designed for flexibility, it can operate independently or in sync with the main grid. Ideal for remote areas, islands, and off-grid locations, this 5.015 MWh Battery Energy Storage System (BESS) delivers high-capacity, stable, and scalable power. It ensures energy availability, reduces reliance on fossil fuels, and enables sustainable, grid-independent operations.
- Warranty
- 120 Months
Battery
- Cell type
- Cells are lithium iron phosphate throughout.
- Cell capacity
- 314
- Cell configuration
- 1PS2S
- Modules per rack
- 8 pcs
- Battery clusters
- 8 pcs
- Rated energy
- ~1500 to 2500Ah3340
- Nominal voltage
- 1164V
- DC voltage range
- 1164.8 ~ 1476.8
- Cooling
- Liquid cooling
Power and grid
- Rated AC power
- 8 × 200
- AC voltage
- 690
- AC frequency
- 3W + PE50 / 60
- Isolation
- No isolation transformer
Environment
- Operating temperature
- -30 ~ 55
- Operating humidity
- 0 ~ 95% (no condensation)
- Max altitude
- 2000
- Noise
- ≤65
Physical
- Size
- 20 feet Container6058 × 2438 × 2896
- Weight
- 30
- Enclosure rating
- IP54
Safety
- Fire suppression
- Heptafluoropropane / Perfluorohexanone compartment level / Aerosol ten water fire protection + combustible gas detection + explosion-proof ventilation system
- Certifications
- IEC62619, UL1973, UL9540A, UN38.3UL1741, EN50549, VDE4110, GB/T34120, GB/T36547
- Standards listed on page
- TransportCell & battery safetyEMCStationary safetyThermal runawayQuality
Communication
- Communication
- Ethernet, RS485, optional 4G/5G mobile communication
Features
- Feature
- Manufactured at CLN Energy's own plant at Sector 140, Noida
More BESS containers from CLN Energy
- 1 MWh BESS Solution
- 2 MWh BESS Solution
- 5 MWh BESS SolutionContainerised 5.015 MWh BESS
CLN Energy 3 MWh BESS Solution, in short
The CLN Energy 3 MWh BESS Solution is a container BESS rated 1600 kW, with cooling Liquid and PCS included. CLN Energy has 3 other container BESS on this site.
Questions about the CLN Energy 3 MWh BESS Solution
- What are the main specifications of the CLN Energy 3 MWh BESS Solution?
- Rated 1600 kW; Cooling Liquid; PCS included. As printed on CLN Energy's spec page (checked November 2026); the full list is on this page.
- Where can I find the CLN Energy 3 MWh BESS Solution spec page?
- CLN Energy publishes it on its own website, and this page links to it. The figures here were last checked against it in November 2026.
- Who makes the CLN Energy 3 MWh BESS Solution?
- CLN Energy, with its head office in Noida. It has 4 container BESS on this site, including this one.
Spot a wrong or outdated figure? Report a correction and we'll check it against the maker's current sheet.
Values as CLN Energy prints them in the linked spec page; NA means it doesn't publish that figure. Nothing here is tested by Ingro Energy, and Ingro Energy is not affiliated with CLN Energy. Product and company names are trademarks of their owners, used only to identify the product.