Co-located storage · your PPC stays

EMS for Co-located Storage at Solar and Wind Plants

Adding a battery behind your plant's connection? Ingro EMS-RE runs it: energy the plant would otherwise curtail is stored, delivered in the hours it is worth most, and used to hold the plant to its schedule. Your power plant controller stays in charge of the connection point. We work with it, not instead of it.

A solar field and two wind turbines feeding a plant substation, with the plant's own power plant controller kept in place and a co-located battery beside it, run by the Ingro EMS cabinet. A dashed link joins the EMS and the PPC: the PPC keeps the connection point, and Ingro EMS runs the battery. Cards note that energy the plant would otherwise curtail is stored, that it is delivered in the evening peak, and that the schedule is held with deviations logged.PPCIngro EMS-REYour PPC
Overview

Storage Beside the Plant You Already Run

Solar parks, wind farms and hybrid plants are adding batteries behind the same connection. The battery needs a controller of its own, and the plant already has one at the connection point.

Curtailment is energy thrown away

On a clear or windy day the plant can produce more than it is allowed to export. Above the limit, output is held back and the energy is lost.

A unit is worth more in the evening

Midday solar is plentiful; the evening peak is where each unit is worth most. A battery moves energy from one to the other only if something decides, every cycle, when to charge and when to discharge.

The short answer

What does an EMS do for a battery at a solar or wind plant?

It decides when the battery charges and discharges. The EMS reads the plant's output, the export limit, the schedule and the battery's own limits on every cycle, then stores energy that would otherwise be curtailed, delivers it in the hours it is worth most, and smooths the plant's output so it holds its schedule.

Where Ingro fits

  • Ingro EMS-RE runs the co-located battery; your PPC keeps the connection point
  • Integrated over the interfaces your PPC and SCADA support
  • Cycling kept inside the warranty limits, battery health reported monthly
  • The EMS alone for your EPC, or the storage delivered turnkey
What we install here

Ingro EMS-RE: Solar & wind plants

Ingro EMS-RE is an energy management system for battery storage co-located with a solar or wind plant. It decides when the battery charges and discharges: storing energy the plant would otherwise curtail, delivering it in the hours it is worth most and holding the plant to its schedule. It works with the plant's existing power plant controller (PPC) and does not replace it.

Runs at: Solar park · Wind farm · Hybrid solar-wind plant · Round-the-clock RE project · Open access and captive plant

  • Curtailed energy stored, not lost
  • Works with your existing PPC
  • Schedule held, deviations cut

Solar or wind plant + co-located battery · works with your PPC

The problem

Why Co-located Storage Underdelivers

The battery is rarely the weak point. The decisions behind it are.

01

Curtailment continues

A battery charged on a fixed timetable is often full, or empty, at the wrong moment, and the plant curtails anyway.

02

Schedules missed

Cloud and wind change output minute to minute. Without storage scheduled against the commitment, deviations follow.

03

Two controllers, one connection

The PPC holds the connection point. A battery controller that ignores it ends up working against it, so the two have to be coordinated by design.

04

Wear nobody prices

Cycling hard for every small gain shortens battery life. Each cycle has to stay inside the limits that protect the warranty.

How it runs

A Day at the Plant

Pick a moment. The parts lit green are working; the PPC holds the connection point throughout.

  • Solar / windWorking
  • Co-located batteryWorking
  • Your PPCWorking
  • The connectionWorking
  • Ingro EMS-REWorking
  • Deviation logStanding by

Ramps smoothed

As output rises, the battery smooths the ramp so the plant follows its schedule rather than the sky.

Who does what

Your PPC Keeps the Connection. Ingro Runs the Battery.

Ingro EMS-RE is added beside the plant controller you already have. Nothing at the connection point is replaced.

Your plant

The power plant controller

  • Set-points to the inverters across the plant
  • The export limit and grid-code compliance
  • Operator instructions at the connection point
Ingro EMS-RE

The battery's controller

  • When to charge and when to discharge
  • Curtailed energy captured, ramps smoothed
  • Schedule tracked, deviations recorded
  • Cycling kept inside the warranty limits
Any make

Battery BMS and PCS

  • Cell limits, state of charge and state of health, read every cycle
  • Power converted at the set-point it is given

How control is split between the PPC and the EMS is agreed at design for each plant: the EMS can follow battery set-points from the PPC, or schedule the battery and give the PPC its available power.

Kinds of site

Where EMS-RE Runs

The EMS works from the plant's metered output, its export limit and its schedule, so the same controller runs storage at a solar park, a wind farm or a hybrid of the two.

IPPs and developers

A solar park adding storage

A running plant with curtailment above its export limit and an evening peak it cannot serve.

The EMS: The battery connected alongside; Ingro EMS-RE integrated with the PPC and SCADA already there.

EMS-RE
Wind developers

A wind farm

Output that follows the wind, not the schedule.

The EMS: The battery scheduled against the commitment, filling lulls and recording every deviation.

EMS-RE
Hybrid project owners

A hybrid solar-wind plant

Two generation profiles behind one connection.

The EMS: One battery schedule across both sources, inside one export limit.

EMS-RE
RE-plus-storage tender projects

Round-the-clock and firm power

A plant that must deliver to a committed profile, at night as well as by day.

The EMS: The battery scheduled against the profile, every deviation recorded. We scope against the tender itself.

Send us the tender
Developers supplying C&I consumers

Open access and captive plants

Solar or wind supplied to a consumer under open access or captive arrangements.

The EMS: Storage scheduled to the agreement the plant supplies against.

Open access energy
Grid-scale BESS tenders

Standalone storage at a substation

Storage on its own connection, not beside a plant.

The EMS: That is EMS-GS, where Ingro EMS is the plant controller.

EMS-GS: grid-scale storage
More than the battery

What EMS-RE Reads and Talks To

Solar or wind plant + co-located battery · works with your PPC. Integration is confirmed against your equipment list during discovery.

Power plant controller

Active and reactive power, ramp rates and export limits at the point of connection. At a solar or wind plant Ingro EMS works with the PPC already there and runs the battery behind it; on standalone storage, Ingro EMS-GS is the plant controller.

Battery BMS and PCS

Cell limits, state of charge and state of health read every cycle, and the power conversion system dispatched inside them.

Energy meters

The incoming revenue meter and sub-meters on feeders, tenants and large loads, read every cycle, so control and the bill work from the same numbers.

Solar inverters

Any make that accepts a remote active-power limit, over Modbus or SunSpec, so solar is held back only when it has to be.

Grid operator schedules

Dispatch instructions executed and deviations recorded in the operator's format and timing.

Plant SCADA and PLCs

Process and equipment signals over Modbus, OPC-UA or IEC 61850, so the EMS sees what the plant is doing; data goes back to your SCADA over REST or WebSocket.

Product + service

From Your Site to a Plant in Service

Ingro scopes, models, commissions and supports the system, or supplies the EMS to the EPC building yours.

  1. 1

    The site is established

    What exists, what has been ordered, and the outcomes the plant is required to deliver. One schedule and one conversation.

  2. 2

    The equipment schedule is issued

    Written against those outcomes, so that the plant is capable of what has been asked of it.

  3. 3

    The plant is modelled

    Your asset counts, loads, tariff and load profile are run against a full simulation of the site before equipment ships, including adverse conditions. Behaviour is reviewed and revised at this stage.

  4. 4

    The plant is commissioned

    Wired, configured and tested against the site's own values, with the results recorded.

  5. 5

    The plant is handed over and supported

    Personnel trained, the reporting suite in service, and a defined route for support thereafter.

FAQ

Co-located Storage, Answered

7 questions

It decides when the battery charges and discharges. The EMS reads the plant's output, the export limit, the schedule and the battery's own limits on every cycle, then stores energy that would otherwise be curtailed, delivers it in the hours it is worth most, and smooths the plant's output so it holds its schedule.

Yes. The battery is connected alongside the existing plant, and Ingro EMS-RE is integrated with the PPC and SCADA already there over the interfaces they support, such as Modbus TCP, IEC 61850, DNP3 or OPC-UA. Compatibility is confirmed against your equipment list during discovery.

Yes. The EMS works from the plant's metered output, its export limit and its schedule, so the same controller runs storage at a solar park, a wind farm or a hybrid of the two.

Storage health and warranty, availability and cycles, and deviations against the schedule, issued monthly for owners and lenders. Where the plant's generation data is shared with the EMS, the Solar Generation Performance report (structured to IEC 61724-1) is issued alongside.

No. The plant's PPC keeps control of the inverters, the export limit and grid-code compliance at the connection point. Ingro EMS-RE runs the co-located battery and works with the PPC. The split of control is agreed at design for each plant: the EMS can follow battery setpoints from the PPC, or schedule the battery and give the PPC its available power.

Yes. Those are renewable plants with storage that must deliver to a committed profile, and the battery is scheduled against that profile with every deviation recorded. Requirements differ by tender and by agreement, so we scope against the document itself.

EMS-GS is for standalone storage at a substation, where Ingro EMS-GS is the plant controller. EMS-RE is for storage that shares a connection with a solar or wind plant, where the plant's own PPC stays in charge and the EMS runs the battery.

Still have a question?

Send us your site, hardware and tariff or tender, and an engineer will answer it.

Add Storage Without Replacing Your PPC

Send the plant's single-line diagram, the PPC and SCADA make, and the export limit or schedule you deliver against. We will scope EMS-RE around what is already there.