EMS Made in IndiaWritten for the tariff, the diesel and the grid you actually have.

An energy management system (EMS) for Indian tariffs, Indian generator fleets and Indian outage patterns — designed, built, commissioned and supported in India, by the engineers you call when a setting needs changing.

An Ingro EMS cabinet at the centre of an Indian site, wired to the utility meter it bills against, a diesel generator, a weak grid connection, and battery storage from more than one manufacturer, with an engineer from the team in India beside it. Four cards name what an EMS built for India handles: the bill and its time-of-day windows and demand ceiling, diesel priced into dispatch, riding through frequent outages, and equipment of any make.DGkVAIngro EMS · made in India
Demand ceiling in the unit your DISCOM bills
kW or kVA
Demand ceiling in the unit your DISCOM bills
15-minute scheduling, exchange and SLDC ready
96 blocks
15-minute scheduling, exchange and SLDC ready
On-site historian, reconciled to the meter
1-minute
On-site historian, reconciled to the meter
Support from the engineers who wrote it
IST
Support from the engineers who wrote it
The short answer

Ingro EMS is an energy management system designed, built and supported in India. It is written around the arithmetic an Indian electricity bill is actually settled on — contracted maximum demand in kW or kVA, time-of-day tariff windows, and the delivered price of diesel — and it is commissioned and supported by an engineering team in the country, on site.

This is not a badge. The decisions an EMS makes every second are priced in local terms, and a controller written for a stable grid and a flat tariff optimises for a site that does not exist here. What follows is what changes when the software was written for the site you own.

Side by side

Imported EMS vs Built for India

The same controller hardware can be told very different things. This is what each one is told about your site.

  • Tariff modelFlat rate or a single peak window, typed in by handYour state DISCOM's ToD windows, rebates, surcharges and seasons, loaded as a template
  • Demand chargePeak kW, whatever the bill saysContract demand in kW or kVA, billing-demand floor and excess-demand penalty
  • Power factorNot in the dispatch logicPF incentive / penalty band held by the inverters' reactive power
  • DieselEmergency backup switchA running cost priced into every dispatch decision
  • OutagesAn exception to alarm onThe normal case: seamless take-over, stability hold, resync policy
  • Power exchangeHourly price feed, if any15-minute blocks for day-ahead, real-time and green markets, with deviation tracked
  • Tariff order changesWait for the vendor's next releaseTemplate updated when the SERC order issues, applied live with an audit trail
  • SupportTicket to an overseas queue, in another time zoneAn engineer in India, in your working day, who can change the setting
  • CommercialsLicence priced in dollars or eurosPriced and invoiced in rupees
Six things that change

Why an EMS Built for India Behaves Differently

The bill

Is your EMS optimising the tariff you are actually billed on?

Indian supply is billed against contracted capacity as well as units, and the demand ceiling is expressed in the unit your supply is billed in — kW or kVA, not whichever the software assumes. Ingro EMS carries the demand ceiling, the time-of-day windows and their rates, and the minimum price differential at which a storage cycle is worth taking, as configured parameters set from your own tariff schedule.

The diesel

Does it treat the generator as a cost, or as a backup switch?

An imported EMS designed for a market with a stable grid treats standby generation as an emergency device. In India it is a running cost. Ingro EMS carries the delivered fuel price into the dispatch decision itself, holds the engine inside its efficient loading band, and directs surplus output into storage to shorten its own run — so fuel falls within each hour, not only in hours.

The grid

What does it do on the fourth outage of the week?

Weak-grid and no-grid operation is the normal case for a large share of Indian sites, not an exception to handle. Storage assumes the load at the instant supply is lost, on a four-second event and a four-hour one alike; on return, a stability hold precedes resynchronisation, under a reconnection policy you choose.

The reporting

Will the numbers stand up in front of your auditor?

Each site-day is closed by differencing cumulative meter counters — the same arithmetic as the utility bill — so the energy ledger reconciles against what the DISCOM invoices rather than against a separate model. Every figure carries its basis and the proportion of the period covered by data.

The people

How far away is the person who can change a setting?

Commissioning, training and support are delivered by an engineering team in India. A configuration change is applied live — the control loop and every background task re-read configuration on their next cycle — and every change is attributed to the user who made it.

The equipment

Does it work with what your contractor can actually source?

The platform is manufacturer-independent and register-map driven: any make of inverter, battery, converter or generator integrates over Modbus TCP, Modbus RTU over RS485, SunSpec, IEC 61850, DNP3 and OPC-UA, plus dry contacts, digital I/O and aggregator gateways. A model not previously encountered is added as configuration, not as new hardware — which matters when the equipment on site is what was available, not what a vendor specified.

DISCOM tariffs built in

Your State's Tariff, Already Loaded

Every site starts from a template of its own DISCOM's tariff order: windows, rebates, surcharges, demand and power factor rules. Pick a tariff shape and watch the schedule follow it.

Cheaper units in the solar hours, a surcharge in the evening peak.

₹0₹2₹4₹6₹800:0006:0012:0018:0023:00outinBattery schedule the EMS draws from this tariff
  • Rebate window
  • Normal
  • Peak surcharge
  • Battery discharging
  • Battery charging
Arbitrage on this day
≈ ₹4,356 / day

Illustrative tariff shapes on a ₹7/kWh base with ±20% windows, not a specific state's order; 0.5 MW / 2 MWh battery at 90% round trip, ToD arbitrage only. On your site the template carries your DISCOM's actual windows and rates, and demand, PF and diesel savings stack on top.

  • Time-of-day windows

    Peak, normal and off-peak blocks with the surcharge or rebate on each, including solar-hour rebates where the state offers them.

  • Seasons and day types

    Summer and winter windows, and holiday or Sunday rules where the order sets them, switched automatically by date.

  • Contract demand

    The sanctioned load in kW or kVA, the minimum billing-demand floor and the penalty rate above the contract.

  • Power factor rules

    The incentive and penalty bands, so the inverters' spare reactive capacity is used to stay in the incentive band.

  • Category and voltage

    HT industrial, commercial, institutional, EV charging or agricultural, at the supply voltage, because each has its own schedule.

  • Open access charges

    Wheeling, transmission, cross-subsidy and additional surcharges and banking terms, so an exchange unit is compared at its landed price.

When the tariff order changes
  1. 1
    SERC issues the tariff order
    Usually once a year, sometimes mid-year.
  2. 2
    Ingro updates the state template
    Windows, rates and rules re-entered and checked by our team in India.
  3. 3
    You approve it for your site
    Side-by-side view of old and new terms before anything changes.
  4. 4
    Controller re-reads it live
    No restart, no site visit. The change is attributed and logged.
With an imported EMS the same change waits for a vendor release, or a technician typing new windows in by hand, while the site pays the new tariff on the old schedule.
Where the savings are

Every Clause of the Bill, Worked On

An Indian bill has six or more lines an EMS can move. Software that only knows peak and off-peak moves one of them.

One month's bill, line by line (₹ lakh)₹62.2 L → ₹46.4 L · 25% lower
Before
₹62.2 L
Peak-window energy
−4.2
Demand charge
−3.0
Excess demand penalty
−2.0
PF penalty
−1.2
DG fuel
−4.8
Normal energy
−0.6
After
₹46.4 L

Illustrative HT industrial site with rooftop solar, a battery and a DG set. Each line is a separate clause of the tariff the EMS is configured with; an imported EMS that knows only “peak” and “off-peak” acts on the first row alone. Your figures come from a simulation on your own bills.

Want an engineer to call you?

Leave your details. An Ingro engineer gets back to you within one business day, no obligation.

Or tell us about your site ↓
VGF and tendered storage

The Tariff Is Won on Paper, Earned in Operation

Viability gap funding makes a lower bid possible. The contract then pays only for the availability, efficiency and schedule adherence the plant can prove.

  1. Step 1

    VGF lowers the capital

    Viability gap funding covers part of the project cost, released against milestones set in the scheme.

  2. Step 2

    So the quoted tariff is lower

    Bidders pass it on in a lower fixed charge per MW per month. Margins in the winning tariff are thin.

  3. Step 3

    The contract sets the conditions

    Availability, round-trip efficiency and schedule adherence are measured, and shortfalls are deducted.

  4. Step 4

    The EMS decides what is earned

    Every block dispatched, every outage hour and every efficiency figure comes from the controller's record.

  • Availability held, not just reported

    The controller keeps the battery inside its contracted state-of-charge window so it is ready when the SLDC calls, and logs every hour it was.

  • Efficiency measured the way the contract measures it

    Round-trip efficiency closed from meter counters at the point the agreement names, monthly and cumulatively, with auxiliary consumption shown separately.

  • Schedules followed block by block

    Dispatch instructions are followed in 15-minute blocks, and deviation is reconciled against the account the SLDC or RPC issues.

  • Evidence ready for the disbursement and the auditor

    Commissioning records, operating reports and alarm histories in the format the lender's engineer asks for, from the day the plant energises.

  • Local conditions in the RfS

    Where a tender carries local-content or data-location conditions, control software designed, built and hosted in India keeps the EMS out of the question. Send the document and we map our scope against it.

Monthly availability vs the contract
90%92%94%96%98%100%Contracted 95% · deductions belowAprMayJunJulAugSepOctNovDecJanFebMar

Illustrative report layout. The contracted threshold and how deductions are computed come from your own agreement; the EMS computes availability from its own record, with every excluded hour and its reason listed.

Power exchange ready

Ready for the Open Energy Exchange

Indian power markets settle in 15-minute blocks. Ingro EMS forecasts, schedules and follows in the same blocks, so a battery can buy cheap exchange power, sell into the evening and stay on schedule.

One trading day, 96 blocks of 15 minutesExchange price (₹/kWh) and the battery's cleared schedule
₹0₹2₹4₹6₹8₹10Buy · 24 midday blocksSell · 16 blocks00:0006:0012:0018:0024:00Actual vs schedule, every block, inside the ±3% band

Illustrative price shape. Market segments, gate-closure times and the deviation band are set by the exchange and the regulator, and are configured to the current rules.

  1. 1Forecast
    D-1, morning

    Load, solar and battery headroom forecast for all 96 blocks of tomorrow.

  2. 2Bid
    D-1, before gate closure

    Buy and sell quantities per block passed to your trading member for day-ahead and green day-ahead markets.

  3. 3Schedule
    D-1, evening

    Cleared volumes and the SLDC schedule loaded as the controller's target for each block.

  4. 4Follow
    Day D, every 15 min

    Battery and generation held on schedule; real-time market used to correct for a changed forecast.

  5. 5Settle
    D+1 onward

    Block-wise actuals vs schedule, deviation charges and banking reconciled to the bills.

  • Schedules in the 15-minute blocks Indian markets settle in, not hourly
  • Day-ahead, real-time and green day-ahead market quantities per block
  • Landed price including open access charges, compared with the DISCOM unit
  • Deviation from schedule tracked live, so penalties are avoided rather than discovered
  • Battery cycles stacked: exchange arbitrage and the site's own peak cut, without double-booking the energy
  • Works through your trading member and open access approvals; Ingro's open access team can run procurement end to end
Open access service
Prompt support

One Call to the Engineer Who Can Change It

When a tariff, a shift pattern or a contract changes, the question is how far away the person is who can change the setting.

Imported EMS5 steps · two time zones, a release cycle
  1. Ticket to the local distributor
  2. Escalated to overseas L2
  3. Wait for their working day
  4. Feature request to the roadmap
  5. Next software release
Ingro EMS3 steps · one call, your working day
  1. Call the engineer who commissioned your site
  2. Live data reviewed with you
  3. Setting changed live, attributed and logged

Same team, start to finish

The engineers who design the controller also commission it and answer the phone afterwards, so nothing is lost in a handover.

In your time zone and your working day

Support runs on Indian hours, in English and Hindi, by people who know what a DISCOM bill and a DG set look like.

On site when it needs to be

Engineers in India attend the site for commissioning, changes in scope and anything that cannot be fixed from the console.

Remote first, with your permission

Most questions are answered from live data in the same call. Remote access is under your control and every action is logged.

And the rest

More Reasons to Buy Indian

  • Data stays in India

    On-site deployment keeps every reading in your plant room; cloud and hybrid deployments are hosted in India.

  • Rupee pricing, GST invoices

    No licence in foreign currency and no exchange-rate exposure on renewals or added sites.

  • A roadmap set by Indian sites

    New features come from what Indian plants ask for: a new tariff rule, a new market product, a new report format.

  • One accountable partner

    Controller, software, commissioning and support from one Indian company, with turnkey BESS available if you want the whole plant.

  • Fits what your contractor sources

    Any make of inverter, battery or DG, including Indian-made equipment, integrated as configuration.

  • Public procurement friendly

    For buyers applying Make in India preference in procurement, send the requirement and we scope against it.

Stated precisely

What “Made in India” Means Here

Six claims, each one something you can hold us to.

Designed in India

The control logic, the operating states and the order of preference were written against Indian sites — their tariffs, their outage patterns and their generator fleets — rather than localised afterwards.

Built and maintained in India

The software, the operator console, the mobile view and the reporting suite are developed and maintained by Ingro Energy's own team, based in India.

Commissioned in India

The controller is wired, configured and tested against the site's own values by engineers who attend the site, with the results recorded and handed over.

Supported in India

Training for the operating team, a defined route for support afterwards, and configuration changes applied live — in your time zone, in your working day.

Reported for Indian readers

The report pack is addressed to the people who actually ask for numbers here: plant management, finance, the lender, the insurer and the auditor — with the energy ledger reconciling to the utility bill.

Honest about certification

Report formats follow the conventions each profession expects — IEC 61724-1, IPMVP, IEEE 762, IEEE 1366, ISA-18.2, the GHG Protocol. Certification itself is issued by accredited bodies, and product listings by the equipment manufacturer. We do not claim either on their behalf.

Common questions

An Indian EMS, Answered

11 questions

Yes. Ingro EMS is an energy management system designed, built and supported in India by Ingro Energy. It runs battery storage, solar generation, standby generation and the utility supply as one plant, in seven products covering commercial and industrial sites (factories, warehouses, offices and campuses), critical sites, EV charging hubs, microgrids, storage at solar and wind plants, grid-scale tendered storage, and homes.

Yes. Ingro EMS is manufacturer-independent and register-map driven — it integrates any make of inverter, battery, converter or generator over Modbus TCP, Modbus RTU over RS485, SunSpec, IEC 61850, DNP3 and OPC-UA, plus dry contacts, digital I/O and aggregator gateways. A model not previously encountered is added as configuration rather than as new hardware.

Ingro's own engineering team, in India. The controller is wired, configured and tested against the site's own values with the results recorded; personnel are trained at handover; and a defined route for support runs afterwards. Configuration changes are applied live and attributed to the user who made them.

Usually yes, and without replacing hardware. The platform connects to existing batteries, inverters, PCS and SCADA over standard protocols, so an existing installation can be retrofitted with a controller that actually optimises the tariff rather than only protecting the asset.

A viability gap funded project wins on a thin fixed charge per MW per month, and the contract then deducts for shortfalls in availability, round-trip efficiency and schedule adherence. Ingro EMS holds the battery in its contracted window, follows dispatch block by block and closes efficiency from meter counters, so the record that decides payment and disbursement comes from the controller. Scheme terms change between rounds, so we scope against the tender document itself.

Support comes from Ingro's engineering team in India, in your working day and time zone, usually from the engineers who commissioned your site. Most questions are answered from live data on the same call, configuration changes are applied live without a restart, and engineers attend site when something cannot be resolved from the console.

Because the decisions an EMS makes are priced in local terms. Contracted maximum demand billed in kW or kVA, time-of-day tariff windows set by a state regulator, the delivered price of diesel and a grid that fails several times a week are inputs to the dispatch decision, not localisation settings. Software written for a stable grid and a flat tariff optimises for a site that does not exist here.

That is your choice. Ingro EMS is deployed on site (offline), in the cloud, or as a hybrid of the two. On site, the historian runs at one-minute resolution in a local time-series database and the controller operates the plant from the plant room, so site control continues with no internet connection at all; in a hybrid deployment the cloud adds fleet visibility, forecasting and remote support on top.

Report formats follow the conventions each profession expects — IEC 61724-1 for generation performance, IPMVP for savings, IEEE 762 for generator operations, IEEE 1366 for supply reliability, ISA-18.2 for alarm performance and the GHG Protocol for emissions. Certification is issued by accredited bodies and product listings by the equipment manufacturer, so we point you to those documents rather than assert them ourselves. For a specific tender or scheme requirement, send the document and we will scope against it.

Yes. Each site is configured from a state tariff template that carries the DISCOM's time-of-day windows with their surcharges and rebates, seasons, contract demand in kW or kVA with the billing-demand floor and excess-demand penalty, power factor bands and open access charges. When the state commission issues a new tariff order, the template is updated and, once you approve it, the controller re-reads it live.

Yes. It forecasts and schedules in the 15-minute blocks Indian markets settle in, prepares per-block quantities for day-ahead, real-time and green day-ahead markets through your trading member, follows the SLDC schedule and tracks deviation live. Exchange units are compared with the DISCOM unit at their landed price, including open access charges.

Still have a question?

Share details of your site, hardware and tariff or tender, and an engineer will answer it.

Want the background first? Battery Energy Storage Systems (BESS) in India: A Buyer's Guide

Send Us the Site, Not the Category

What is on site today, what is already ordered, the outcomes required in priority order, and whether the utility connection remains. We return a scope of supply, an equipment schedule and an indicative programme.

What are you looking for?

An engineer replies within one business day. Bills, drawings or data files can go in reply to that email, or to contact@ingroenergy.com. Privacy policy

Want numbers first? Simulate the site.