The CEA (Technical Standards for Construction of Electrical Plants and Electric Lines) Amendment Regulations, 2026 add standards for solar, wind and BESS, including the first statutory specification for a BESS energy management system. In force from 1 April 2027.
What it changes: From April 2027 every BESS needs an EMS with SCADA integration, remote set-points and 90-day high-resolution logging; 50 MW and above also needs AGC, grid-forming and black start.
Mar 2026
CEA
The CEA (Measures relating to Safety and Electric Supply) Amendment Regulations, 2026 add a chapter on BESS safety. Published in the Gazette on 30 March 2026, in force from 1 April 2027.
What it changes: Any BESS connected above 650 V must meet two-fault tolerance, cell-level monitoring, fire suppression and a third-party fire safety audit.
Dec 2025
Ministry of Power
BESS tenders under the PSDF-funded VGF scheme must have at least 20% local content by project cost. The EMS software developed in India counts towards it.
What it changes: Bidders for VGF-backed BESS must show at least 20% domestic value, and an Indian EMS helps meet it.
Jan 2025
MNRE
Replaces the 2017 compulsory registration order. Solar modules, solar storage batteries and PV inverters must meet Indian Standards and carry the BIS mark.
What it changes: Modules, inverters and solar storage batteries sold in India need a BIS licence, so check certification before buying.
Sep 2023
Ministry of Power
Policy, regulatory and financial measures to deploy battery and pumped storage. Dated August 2023, released September 2023.
What it changes: The umbrella policy behind later storage measures such as VGF, ISTS waivers and BESS procurement rules.
Aug 2022
MoEFCC
Extended producer responsibility for all battery types, including EV and industrial batteries: collection, recycling targets and minimum recycled content.