  1. Aug 2026

    CERC

    DSM (Third Amendment) Regulations, 2026: general-seller treatment for new RE

    Ends the softer deviation treatment for new wind and solar, and sets a rate for standalone storage's trial-run power. In force from 31 August 2026.

    What it changes: Solar and wind bid from 2027 face the same deviation charges as conventional plants, so storage and EMS-based schedule tracking become close to essential.

    StorageEMSSolarGridOfficial PDFDetails
  2. Jul 2026

    CEA

    Cyber Security in Power Sector Regulations, 2026

    The first binding cyber-security regulations for the power sector. They cover generators, captive plants and energy storage owners of 50 MW or more, from 1 April 2027.

    What it changes: Plants of 50 MW and above must lock down SCADA, EMS and plant-controller networks: remote access only for troubleshooting, remote operation only from India, data kept in India and equipment from trusted sources.

    StorageEMSGridOfficial PDFDetails
  3. Jun 2026

    CEA

    Construction standards for BESS and RE plants, with EMS requirements (2026)

    The CEA (Technical Standards for Construction of Electrical Plants and Electric Lines) Amendment Regulations, 2026 add standards for solar, wind and BESS, including the first statutory specification for a BESS energy management system. In force from 1 April 2027.

    What it changes: From April 2027 every BESS needs an EMS with SCADA integration, remote set-points and 90-day high-resolution logging; 50 MW and above also needs AGC, grid-forming and black start.

    StorageEMSBatteriesGridSolarOfficial PDFDetails
  4. Mar 2026

    CEA

    Safety regulations for battery energy storage systems (2026)

    The CEA (Measures relating to Safety and Electric Supply) Amendment Regulations, 2026 add a chapter on BESS safety. Published in the Gazette on 30 March 2026, in force from 1 April 2027.

    What it changes: Any BESS connected above 650 V must meet two-fault tolerance, cell-level monitoring, fire suppression and a third-party fire safety audit.

    StorageBatteriesEMSOfficial PDFDetails
  5. Dec 2025

    Ministry of Power

    Minimum 20% local content for BESS under the VGF scheme

    BESS tenders under the PSDF-funded VGF scheme must have at least 20% local content by project cost. The EMS software developed in India counts towards it.

    What it changes: Bidders for VGF-backed BESS must show at least 20% domestic value, and an Indian EMS helps meet it.

    StorageEMSBatteriesOfficial PDFDetails
  6. Sep 2025

    Ministry of Power

    Electricity (Amendment) Rules, 2025: who can own and run energy storage

    Rewrites the energy storage parts of Rule 18 of the Electricity Rules, 2005. Storage can run on its own or as part of generation, transmission or distribution.

    What it changes: Consumers and independent providers can own, lease or operate storage, and sell or rent its capacity to others.

    StorageGridOfficial PDFDetails
  7. Jun 2025

    CERC

    ISTS charges waiver phased out for RE; co-located BESS exempt to June 2028

    The CERC (Sharing of Inter-State Transmission Charges and Losses) (Fourth Amendment) Regulations, 2025 step down the waiver for new solar and wind after 30 June 2025. Storage charged from a co-located RE plant keeps a full waiver to June 2028.

    What it changes: ISTS solar and wind commissioned after June 2025 pay a rising share of transmission charges, while co-located BESS stays fully exempt until June 2028.

    StorageSolarGridOfficial PDFDetails
  8. Jun 2025

    Ministry of Power

    Viability gap funding for 30 GWh of battery storage from PSDF

    ₹5,400 crore from the Power System Development Fund for 30 GWh of BESS: 25 GWh across 15 states and 5 GWh for NTPC. An August 2025 amendment requires EMS software developed in India and bars refurbished cells.

    What it changes: Standalone BESS tenders grow sharply, and VGF-funded plants need an Indian EMS.

    StorageEMSGridOfficial PDFDetails
  9. Feb 2025

    Ministry of Power

    Advisory: 2-hour co-located storage with new solar tenders

    Implementing agencies and state utilities are advised to require co-located storage in future solar tenders: at least 2 hours, sized at 10% of solar capacity.

    What it changes: New solar tenders are expected to include 2-hour storage at 10% of plant capacity, so developers plan BESS from the start.

    StorageSolarpowermin.gov.inDetails
  10. Jan 2025

    MNRE

    Solar Systems, Devices and Components Goods Order, 2025

    Replaces the 2017 compulsory registration order. Solar modules, solar storage batteries and PV inverters must meet Indian Standards and carry the BIS mark.

    What it changes: Modules, inverters and solar storage batteries sold in India need a BIS licence, so check certification before buying.

    SolarBatteriesStorageOfficial PDFDetails