  1. Aug 2026

    CERC

    DSM (Third Amendment) Regulations, 2026: general-seller treatment for new RE

    Ends the softer deviation treatment for new wind and solar, and sets a rate for standalone storage's trial-run power. In force from 31 August 2026.

    What it changes: Solar and wind bid from 2027 face the same deviation charges as conventional plants, so storage and EMS-based schedule tracking become close to essential.

    StorageEMSSolarGridOfficial PDFDetails
  2. Jul 2026

    CEA

    Cyber Security in Power Sector Regulations, 2026

    The first binding cyber-security regulations for the power sector. They cover generators, captive plants and energy storage owners of 50 MW or more, from 1 April 2027.

    What it changes: Plants of 50 MW and above must lock down SCADA, EMS and plant-controller networks: remote access only for troubleshooting, remote operation only from India, data kept in India and equipment from trusted sources.

    StorageEMSGridOfficial PDFDetails
  3. Jun 2026

    CEA

    Construction standards for BESS and RE plants, with EMS requirements (2026)

    The CEA (Technical Standards for Construction of Electrical Plants and Electric Lines) Amendment Regulations, 2026 add standards for solar, wind and BESS, including the first statutory specification for a BESS energy management system. In force from 1 April 2027.

    What it changes: From April 2027 every BESS needs an EMS with SCADA integration, remote set-points and 90-day high-resolution logging; 50 MW and above also needs AGC, grid-forming and black start.

    StorageEMSBatteriesGridSolarOfficial PDFDetails
  4. Apr 2026

    CEA

    Installation and Operation of Meters Amendment Regulations, 2026

    Smart meters for all consumers where a communication network exists, and the smart meter as interface meter for low-voltage open-access consumers.

    What it changes: Interoperable smart metering with interval data underpins ToD billing and open-access settlement, and feeds an EMS's tariff-aware dispatch.

    Open accessEMSGridOfficial PDFDetails
  5. Sep 2025

    Ministry of Power

    Electricity (Amendment) Rules, 2025: who can own and run energy storage

    Rewrites the energy storage parts of Rule 18 of the Electricity Rules, 2005. Storage can run on its own or as part of generation, transmission or distribution.

    What it changes: Consumers and independent providers can own, lease or operate storage, and sell or rent its capacity to others.

    StorageGridOfficial PDFDetails
  6. Jun 2025

    CERC

    ISTS charges waiver phased out for RE; co-located BESS exempt to June 2028

    The CERC (Sharing of Inter-State Transmission Charges and Losses) (Fourth Amendment) Regulations, 2025 step down the waiver for new solar and wind after 30 June 2025. Storage charged from a co-located RE plant keeps a full waiver to June 2028.

    What it changes: ISTS solar and wind commissioned after June 2025 pay a rising share of transmission charges, while co-located BESS stays fully exempt until June 2028.

    StorageSolarGridOfficial PDFDetails
  7. Jun 2025

    Ministry of Power

    Viability gap funding for 30 GWh of battery storage from PSDF

    ₹5,400 crore from the Power System Development Fund for 30 GWh of BESS: 25 GWh across 15 states and 5 GWh for NTPC. An August 2025 amendment requires EMS software developed in India and bars refurbished cells.

    What it changes: Standalone BESS tenders grow sharply, and VGF-funded plants need an Indian EMS.

    StorageEMSGridOfficial PDFDetails
  8. Aug 2024

    CERC

    Deviation Settlement Mechanism Regulations, 2024

    Charges for deviating from schedule in the inter-state grid, with separate rules for wind and solar, standalone storage and co-located storage. In force from 16 September 2024.

    What it changes: Tighter deviation bands for solar and wind make forecasting and EMS-driven storage dispatch worth money, and co-located storage is settled by operating mode.

    StorageEMSSolarGridOfficial PDFDetails
  9. Feb 2024

    Ministry of Power

    Electricity (Rights of Consumers) Amendment Rules, 2024: faster rooftop solar

    Rooftop solar up to 10 kW no longer needs a technical feasibility study, and larger systems get shorter discom deadlines.

    What it changes: Rooftop solar applicants get faster approvals and fixed discom deadlines; complete applications up to 10 kW are deemed accepted.

    SolarGridOfficial PDFDetails
  10. Sep 2023

    Ministry of Power

    National Framework for Promoting Energy Storage Systems

    Policy, regulatory and financial measures to deploy battery and pumped storage. Dated August 2023, released September 2023.

    What it changes: The umbrella policy behind later storage measures such as VGF, ISTS waivers and BESS procurement rules.

    StorageBatteriesGridpowermin.gov.inDetails