Rajasthan ki sarson tel mill par rooftop solar: units lapse kyun hoti hain, aur battery ka hisaab banta hai ya nahi

Mandi mein nayi sarson aate hi aapke expeller chalne lagte hain, aur shed ki chhat par 100 se 400 kWp ke panel lage hain. Kuch mahino ke bill mein solar units export dikhti hain jinka aapko kuch nahi mila; zero export wale plant par inverter app mein dopahar ko graph flat ho jata hai. Season ke baad expeller khade rehte hain aur panel kisi ke liye bijli banate rehte hain. Yeh page Bharatpur, Alwar, Jaipur, Kota ya Sri Ganganagar belt ki kachi ghani ya expeller mill, ya chhoti solvent extraction unit ke malik ke liye hai. Ismein woh baatein hain jo Rajasthan mein alag hain: RERC ka rule jisse mill ka surplus lapse hota hai, industrial tariff aur uske time-of-day rate, sarson ka season, aur battery kab theek hai aur kab nahi.

16 November 2026 ko Ingro Energy ki project team ne check kiya

Seedha jawab

  • Rajasthan ke 2021 ke rooftop solar regulations mein, net metering wale non-domestic consumer ko surplus ka koi paisa nahi milta: billing period ke end mein jo bacha, woh lapse. Bina net metering ke behind-the-meter plant par surplus kaat diya jata hai, aur jo bahar nikle use inadvertent injection maana jata hai, jis par penalty lag sakti hai.
  • Yaani unit tabhi lapse hoti hai jab us mahine mill ne jitna liya usse zyada export kiya. Season mein, expeller chalte hue, net metering par aisa kam hota hai. Off-season mein hota hai, aur battery use theek nahi kar sakti, kyunki rakhi units dene ke liye kuch chal hi nahi raha.
  • Rajasthan ke industrial energy charge ₹6.50 per unit aur ₹1 regulatory surcharge par, kati hui solar store karne wali battery kam kamaati hai. Neeche ke example mein, 250 kWp ka zero export plant, saal mein 8 mahine pisai wali mill ke liye payback lagbhag 21 se 32 saal, aur saal bhar pisai ho tab bhi lagbhag 14 se 22 saal.
  • Zyada tar mills ke liye pehla kadam metering hai: zero export ki jagah net metering, season ke load ke hisaab se plant, aur poochhiye ki group net metering se off-season units doosre connection par ja sakti hain ya nahi. Battery tabhi theek lagti hai jab shaam ya raat ka regular load ho, baar baar cut aate hon jinme DG chalta hai, ya plant ko net metering mil hi na sake.
Apni mill ke solar plant se hisaab lagaiye

Tel mill mein aapka solar kahan jaata hai

Chalte waqt expeller mill ka load rice mill se zyada seedha rehta hai: beej haath mein ho to expeller, seed cleaner, elevator, filter press aur pump lambe ghante saath chalte hain. Surplus tab aata hai jab line rukti hai, aur sabse bada surplus tab jab season khatam hota hai. Us surplus ka kya hota hai, yeh is par hai ki plant kaise juda hai.

Mill mein kya hota haiZero export (behind the meter)Net metering
Safai, breakdown ya cut ki wajah se dopahar ko expeller bandUn ghanton ka solar kataExport; mahine ke import mein adjust
Godown mein beej kam, kuch hi expeller chal raheDin ke solar ka hissa kataExport; aam taur par mahine mein hi khap jata hai
Weekly off ya mandi ki chhuttiLagbhag poora din kataExport; aam taur par mahine mein hi khap jata hai
Off-season, mill bandMahino tak lagbhag saari bijli katiExport import se zyada; mahine ka surplus lapse
Season shuru ya khatam, mahine mein kuch hi din pisaiRoz bada hissa kataSurplus import se zyada ho sakta hai; us mahine ka surplus lapse

Kuch bhi tay karne se pehle do cheezein dekhiye: pichhle saal ke har mahine ke bill mein export aur import units, aur saaf dhoop wale pisai ke din aur band din ka inverter app graph.

Mill par rooftop solar ke liye Rajasthan ke rules

Yeh RERC ke 2021 ke regulations aur baad ke badlavon ki trade reports se hain, saal ke saath. Asli baat aapka connection agreement aur aapki DISCOM (Jaipur zone mein JVVNL, Ajmer mein AVVNL, Jodhpur mein JdVVNL) hai.

RuleKya kehta haiTel mill ke liye matlab
RERC Grid Interactive DRE Regulations, 2021: sizePlant sanctioned load ya contract demand ke 100% tak, aur net metering ya net billing mein 1 MW tak. Ek distribution transformer par saare plant uski capacity ke 50% tak. 1 July 2021 se commission hue plant par lagu.300 kVA contract demand wali mill usi ke barabar plant laga sakti hai; bhara transformer phir bhi file rok sakta hai
2021: net metering, non-domesticBilling period ke end mein bacha net surplus lapse, koi paisa nahi. Domestic consumer ko surplus ka paisa milta hai; baakiyon ko nahi. 2015 ke purane rules wale net metering plant bhi isme aate hain.Units tabhi lapse hoti hain jab mahine mein export import se zyada ho. Season mein kam; off-season mein aam baat
2021: net billingSaari generation DISCOM ko bechi jati hai, haal ke solar bids se tay rate plus 25% incentive par, aur bill mein credit. JVVNL ke October 2025 ke order mein net billing rate ₹3.65 per unit bataya gaya.Har unit ko kam rate milta hai, woh bhi jo mill ₹7.50 waali jagah khud use kar sakti thi. Chalti mill ke liye kam hi theek
2021: behind the meter, bina net meteringDISCOM ko pehle soochna dekar allowed, contract demand ke 100% tak. Jo bhi bijli bahar jaaye woh inadvertent injection, penalty lag sakti hai.Yahi zero export hai: jab mill panel se kam le, controller ko inverter kaatne padte hain
2021: storagePlant storage ke saath ya bina lag sakta hai.Battery allowed hai; woh mill ki grid khapat badalti hai, settlement ka rule nahi
Draft amendment, 2023 aur 20242023 ke draft First Amendment mein tha ki connection agreement ki AC capacity se upar ki generation lapse ho. 2024 ka draft Second Amendment approval ki timeline aur schools ke net billing par tha.In par bharosa karne se pehle dekhiye ki notify hue ya nahi, aur kis roop mein
Third Amendment, 2025 (trade reports)Virtual aur group net metering approve, 1 kW se 1 MW tak ke plant, saari consumer categories ke liye. Battery storage wale plant ko storage ke size ke hisaab se 100% tak wheeling charge mein chhoot.Poochhiye ki aapka doosra connection group net metering mein off-season surplus le sakta hai ya nahi

Yeh rules aksar badalte hain. DISCOM se likhit mein poochhiye ki aapke connection ki date par regulations ka kaunsa version lagta hai, aur kisi baad ke amendment ne industry ke liye lapse ka rule badla ya nahi.

Billing period ke end mein lapse ka aapki mill ke liye matlab

Net metering mein DISCOM billing period mein aapki export units ko import units se ghata deti hai. Import zyada hua to farak ka paisa dijiye, kuch nahi khota. Export zyada hua to extra period ke end mein khatam. Agle mahine kuch nahi jaata aur paisa bhi nahi milta.

Jo mill din mein aur shaam tak pisai karti hai, uska dopahar ka surplus aam taur par usi mahine ke shaam aur raat ke import mein khap jata hai. Yaani season mein net metering battery ka zyada tar fayda muft mein de deti hai. Lapse hone wali units off-season ki hain, aur season ke shuru aur end ke patle mahino ki.

Zero export par tasveer alag hai: dopahar ka surplus har pisai ke din kat jata hai, season mein bhi, aur yahi surplus battery pakad sakti hai. Isliye sabse pehle metering arrangement dekhiye.

Rajasthan ka industrial tariff, time of day aur seasonal factory ka rule

Rajasthan ki DISCOMs ke 2025 ke tariff schedule, RERC ke 3 October 2025 ke tariff order se, oil mill ko naam se seasonal factory mein ginte hain. 2026-27 ke tariff 1 April 2026 se waise hi rahe, bas medium industry mein kami ki report hai.

Tariff itemSchedule kya kehta haiSolar aur battery ke liye kyun zaroori
Energy charge, large industry (LP/HT-5, 150 HP ya 125 kVA se upar)650 paise per unit, plus ₹380 per kVA billing demand ka fixed chargeMill mein use hui har solar unit isi ki jagah leti hai
Regulatory surchargeIndustry ke liye ₹1 per unit, energy charge ke uparGrid se na li gayi har unit ki keemat badhata hai
Time of day, 10 kW se upar load12 baje se 4 baje tak energy charge par 10% chhoot; subah 6 se 8 baje 5% surcharge; shaam 6 se raat 10 baje 10% surchargeDopahar ko use hua solar din ki sabse sasti unit ki jagah leta hai, surcharge ke saath lagbhag ₹6.85; shaam ki unit lagbhag ₹8.15
Seasonal factory: oil mill, oil refining, ginning, rice mill aur baaki8 mahine tak ka season; kam se kam 4 mahine off-season, jisme fixed charge normal ka 25%Tariff khud maanta hai ki aapki mill saal ka kuch hissa band rehti hai
Seasonal factory: off-season khapatOff-season ke kisi mahine ki khapat pichhle season ki mahine ki average ke 25% se zyada hui to us mahine ki bijli normal rate ke dedh guna parSolar khapane ke liye off-season mein extra load chalana bill par ulta pad sakta hai; pehle check kijiye

Electricity duty, fuel aur power purchase surcharge aur fixed charge upar se lagte hain. Calculator aur example sirf energy charge aur regulatory surcharge lete hain, isliye hisaab kam karke hai.

Sarson ka season hi hisaab tay karta hai

Bharat ki lagbhag aadhi sarson Rajasthan ugata hai: Solvent Extractors' Association ne 2025-26 mein 119.4 lakh tonne ki fasal mein Rajasthan ko 53.9 lakh tonne bataya. Nayi fasal February ke end se mandi mein aati hai, aur 28 February se 30 March 2026 ke beech desh ki sarson ki aawak mein lagbhag aadha hissa Rajasthan ka tha. Rajya mein MSP par kharid 1 April 2026 se shuru hui, ₹6,200 per quintal par.

Fasal ka calendar aapki mill par kaise asar karta hai, yeh is par hai ki aap beej kaise kharidte hain. Jo mill sirf nayi aawak pisti hai uska season chhota aur bhaag-daud wala hai. Jo beej kharid ke rakhti hai woh zyada mahine pisti hai. Tariff seasonal factory ko 8 mahine tak ka season declare karne deta hai.

Battery sirf unhi dino kamaati hai jab mill chalti hai, jab woh dopahar ke surplus se charge ho kar usi shaam ya agli subah units wapas de. Isliye pisai ke din imaandari se giniye: 8 mahine, 26 din mahina, matlab saal par average karke lagbhag 17 din mahina, aur neeche calculator mein yahi number daaliye.

Rajasthan ke bill par rakhi hui solar unit ki keemat

Battery jitna leti hai uska lagbhag 85% wapas deti hai. ₹7.50 per unit par (₹6.50 energy charge plus ₹1.00 regulatory surcharge), rakhi aur baad mein use hui solar unit lagbhag ₹6.38 bachati hai.

Time of day se zyada farak nahi padta. Dopahar ko rakhi unit warna dopahar ke chhoot wale rate, lagbhag ₹6.85, wali grid unit ki jagah leti. Shaam 6 se raat 10 baje wapas di jaaye to lagbhag ₹8.15 wali unit ki jagah leti hai, par uska sirf lagbhag 85% wapas aata hai, jiski keemat lagbhag ₹6.93. Unit ko shaam tak le jaane ka fayda kuch paise ka hai; battery ko unhi units se kamaana hai jo warna kho jaatin.

Calculator sirf pisai ke din ka roz ka surplus ginta hai. Grid cut mein chalta solar, diesel ki bachat, demand charge ya ToD rate isme nahi.

Apni mill ke solar plant se hisaab lagaiye

Inverter app aur bill se paanch number. Jab tak aap check karne ko na kahein, kuch kahin nahi jaata.

Figure dekhne ke liye plant ka size aur bekaar jaate solar ka hissa daaliye.

Yeh hisaab kaise banta hai
  • Solar average din mein lagbhag 4.25 unit per kWp banata hai. Kohre wale sardi ke din aur monsoon ke din kam.
  • Jo hissa aap daalte hain woh pisai ke din ka roz ka surplus hai. Sirf pisai ke din gine jaate hain: 8 mahine 26 din pisne wali mill lagbhag 17 daale. Off-season ka surplus chhoda gaya hai kyunki use dene ko load nahi.
  • Battery ka size itna ki woh surplus ek charge mein aa jaaye, rated kWh ka lagbhag 90% use karke, aur har pisai ke din ek baar bhari aur khaali hoti hai.
  • Battery jitna leti hai uska lagbhag 85% wapas deti hai. Wapas di har unit aapke daale grid rate jitna bachati hai; jo unit ab export nahi hoti uska export credit ghata diya jata hai.
  • Lagi hui keemat 250 kWh se chhoti battery ke liye ₹25,000 se ₹38,000 per kWh, aur usse upar ₹20,000 se ₹30,000 per kWh, GST se pehle. Yeh kaam chalau range hai, quote nahi.
  • Isme nahi gina: grid cut mein chalta solar, diesel ki bachat, ToD rate, demand charge, aur saalon mein battery ki ghatti capacity.
  • Yeh pehla andaaza hai. Price dene se pehle aapka load pattern, motor starting, metering aur tariff check hota hai.

Apni mill ka figure check karwaiye

Free expert salah ke liye naam aur number chhodiye. Hum call karke batayenge ki aapka solar kya kho raha hai aur aapki mill mein kaunsa solution paisa vasool hai.

Apni mill aur uske solar ke baare mein bataiye ↓

Example: 250 kWp wali expeller mill zero export par, season aur saal bhar

Yeh ek misaal hai, koi asli mill nahi. Inputs: 250 kWp ke panel, behind the meter bina export, pisai ke din ka 20% solar kata jab expeller rukte hain ya beej kam padta hai, grid bijli ₹7.50 per unit. Yeh calculator ka hi hisaab hai, upar wahi number daaliye to wahi jawab aayega.

Plant average din mein lagbhag 1,063 unit banata hai, jinme se lagbhag 213 kat jaati hain. 240 kWh ki battery itna rakh leti hai, aur lagi hui lagbhag ₹60 lakh se ₹91 lakh ki padti hai.

Saal mein 8 mahine, 26 din mahina pisai par battery saal mein lagbhag ₹2.8 lakh bachati hai aur payback lagbhag 21 se 32 saal. Agar mill din mein 300 quintal pisti hai, to season ke 62,400 quintal par yeh lagbhag ₹4.52 per quintal hai. Rakha hua beej saal bhar 26 din mahina pise, to bachat lagbhag ₹4.2 lakh saal ho jaati hai aur payback phir bhi lagbhag 14 se 22 saal.

Off-season ka hisaab: 4 mahine mill band, aur plant mahine mein lagbhag 31,875 unit banata hai, kul lagbhag 1,27,500 unit. Zero export par yeh kat jaati hain; net metering par har mahine ke end mein lapse. Battery inme se ek bhi nahi bachati, kyunki use karne ko kuch chal nahi raha.

Ab net metering se milaiye. Season mein pisai ke dino ki kati units saal mein lagbhag 44,200 hoti hain, ₹7.50 par lagbhag ₹3.3 lakh ki, agar net metering mill ko inhe shaam aur raat ke import mein adjust karne de, bina battery khareede.

Inputs badaliye to jawab badalta hai. Regular raat ki shift, ya din ke cut jinme DG chalta hai, battery ka case behtar karte hain; kam katna ya kam pisai ke din use kharab karte hain.

Battery se pehle yeh try kijiye

  • Plant zero export par hai to net metering ke liye apply kijiye, aur mana ho to likhit mein wajah maangiye. Aam wajah bhara hua distribution transformer hoti hai.
  • Pichhle baarah bill padhiye. Agar units sirf off-season mahino mein lapse hoti hain, to battery isme kuch nahi badlegi.
  • DISCOM se poochhiye ki 2025 ke amendment ki group net metering se off-season surplus aapke doosre connection par ja sakta hai ya nahi.
  • Season mein mill jitna khaati hai usse zyada panel mat lagaiye. Net metering par extra lapse hoga; zero export par katega.
  • Jahan process allow kare, beej ki safai, filtering, packing aur pump jaise kaam solar ke ghanton mein le aaiye.
  • Off-season mein solar khapane ke liye extra load chalane se pehle seasonal factory ka rule dekhiye: season ki average ke 25% se upar wala mahina dedh guna rate par bill hota hai.

Expeller ki motor aur grid cut

Expeller line badi motoron ki qataar hai jo load par start hoti hain, saath mein elevator, cleaner, filter press aur pump. Har motor start hote waqt kuch second apne running current ka kai guna kheenchti hai. Grid par yeh transformer sambhalta hai. Agar battery se cut mein bhi expeller chalwane hain, to uske inverter ko yeh starting current khud dena padega, jisse woh sirf surplus solar rakhne wali battery se bada aur mehnga ho jata hai.

Yeh backup paisa vasool hai ya nahi, yeh is par hai ki aapki mill par grid kitni baar jaati hai aur ruka expeller khali, tel aur dobara chalu karne mein kitna nuksaan karta hai. Yeh engineer ka sizing ka sawaal hai, aapke cut log aur motor list se.

Tel mill ke liye battery kab theek nahi

  • Aapka surplus zyada tar off-season ka hai. Battery units ko ghanton ke liye chalti mill mein shift karti hai, mahino ke liye nahi.
  • Aap net metering par hain aur pisai ke mahino ke bill mein kuch lapse nahi dikhta. Grid battery ka kaam muft mein kar rahi hai.
  • Net metering mil sakti hai par apply nahi kiya. Pehle metering theek kijiye.
  • Mill sirf din mein chalti hai aur solar din ke load se chhota hai. Rakhne ko surplus hi nahi.
  • Na shaam ya raat ka load, na baar baar cut. Battery dopahar ko bharti hai aur khaali karne ki jagah nahi.

Agar aapki mill mein asli dikkat grid cut aur DG hai aur solar baad ki baat, to diesel ka hisaab DG wali factory ki hamari guide mein hai.

Turnkey project mein aapki mill ke liye kya kya aata hai

Agar aapki mill ke liye hisaab banta hai, to aage ka kaam Ingro ki team sambhalti hai: aapke bill aur solar data padhna, season ke hisaab se system ka size, kisi bhi company ki battery aur Ingro EMS ke saath design aur integration, DISCOM ki kaagazi kaarwai mein madad, commissioning aur maintenance. Ingro battery nahi banata. Pehle check se O&M tak aapko ek hi team se baat karni hai.

Sign karne se pehle kya poochhein

  • Mera plant net metering, net billing ya behind the meter par hai, aur mere connection ki date par RERC regulations ka kaunsa version lagta hai?
  • Pichhle saal maine kitni units khoyin, mahine ke hisaab se, aur unme se kitni pisai ke season mein thi?
  • Payback meri asli pisai ke dino par nikala hai, ya baarah mahine 26 din mahine par?
  • Kya aapne pehle net metering ya group net metering check ki, aur usse kitna milta?
  • Kya meri DISCOM dopahar ki export units ko shaam ke import se unit ke badle unit ghatati hai, ya time-of-day block ke hisaab se?
  • Battery ke inverter ko kaunsi motor start karni hai, agar koi, aur kyun?
  • Cabinet kahan khada hoga, beej ki dhool, tel aur khali se door, aur warranty kitne saal aur kitne cycle ki hai?

Aage kaam ka

Tel mill ke malik jo poochhte hain

Mere bill mein solar export units dikhti hain par credit nahi. Kyun?

RERC ke 2021 ke regulations mein net metering wale non-domestic consumer ko surplus ka paisa nahi milta. Export billing period mein import se ghataya jata hai, aur period ke end mein jo surplus bache woh lapse. Agar yeh zyada tar off-season mein hota hai, to yeh season hai, billing ki galti nahi.

Kya battery off-season mein lapse hone wali units bacha legi?

Nahi. Battery units ko kuch ghanton ke liye chalti mill mein shift karti hai. Expeller band hon to rakhi units dene ko kuch nahi. Poochhne layak cheez group net metering hai, aapke doosre connection par, agar DISCOM allow kare.

Net metering ki jagah net billing le loon?

Chalti mill ke liye kam hi. Net billing mein har unit DISCOM ko solar bids se tay rate par bikti hai, JVVNL ke October 2025 ke order mein ₹3.65 per unit bataya gaya, jabki aap lagbhag ₹7.50 mein khareedte hain. Net metering season mein apni units poore rate par use karne deti hai.

Kya time-of-day tariff se battery paisa vasool ho jaati hai?

Akele nahi. Dopahar ke ghanton mein 10% chhoot hai aur shaam 6 se raat 10 baje 10% surcharge, par battery jo leti hai uska sirf lagbhag 85% wapas deti hai, to dopahar se shaam le jaayi unit sirf kuch paise kamaati hai. Battery ko unhi units se kamaana hai jo warna kho jaatin.

Off-season mein solar khapane ke liye extra load chala loon?

Pehle seasonal factory ka rule dekhiye. 2025 ke tariff mein, agar off-season ke kisi mahine ki khapat pichhle season ki mahine ki average ke 25% se zyada ho, to us mahine ki bijli normal rate ke dedh guna par bill hoti hai.

Kya tel mill par solar ya battery ke liye Rajasthan mein subsidy hai?

Rajasthan Agro-processing, Agri-business and Agri-export Promotion Policy, 2019 mein capital subsidy lene wali unit ko solar plant ki keemat ka extra 30%, ₹10 lakh tak, milta tha. Usme battery ka zikr nahi tha, aur woh 31 March 2024 tak lagu thi. Kisi subsidy par bharosa karne se pehle agriculture marketing board ya industries department se poochhiye ki uski jagah kya aaya.

Sources

  1. CBIP summary of the RERC (Grid Interactive Distributed Renewable Energy Generating Systems) Regulations, 2021 (8 Apr 2021): plant up to 100% of sanctioned load, up to 1 MW, 50% of a transformer; non-domestic net-metering surplus lapses at the end of the billing period; behind-the-meter plants and inadvertent injection
  2. IIT Kanpur, Centre for Energy Regulation: note on the draft RERC (Grid Interactive DRE) (First Amendment) Regulations, 2023
  3. K S & K: RERC draft Grid Interactive DRE (Second Amendment) Regulations, 2024
  4. SolarQuarter (14 Oct 2025): RERC approves the Third Amendment, 2025: virtual and group net metering, wheeling waiver for systems with battery storage
  5. Powerline (17 Oct 2025): draft RERC Third Amendment, 2025: virtual and group net metering from 1 kW to 1 MW for all categories, battery-linked wheeling waiver
  6. SolarQuarter (4 Nov 2025): JVVNL order of 27 Oct 2025 on net metering and net billing rates
  7. Jaipur Discom (JVVNL) Tariff for Supply of Electricity, 2025 (RERC tariff order of 3 Oct 2025), as published by a distribution franchisee: seasonal factories incl. oil mills, industrial energy charges, ToD, regulatory surcharge
  8. Jodhpur Discom (JdVVNL) Tariff for Supply of Electricity, 2025, as published by a distribution franchisee: the same seasonal-factory and ToD terms
  9. Pink City Post (3 Apr 2026): Rajasthan tariffs for 2026-27 unchanged from 1 April; large industry ₹6.50 a unit, ToD and regulatory surcharge continue
  10. Government of Rajasthan: Rajasthan Agro-processing, Agri-business & Agri-export Promotion Policy, 2019 (notification of 12 Dec 2019)
  11. AgroSpectrum (Mar 2026): rapeseed-mustard mandi arrivals, 28 Feb to 30 Mar 2026, Rajasthan nearly half
  12. Devdiscourse / PTI (17 Mar 2026): Rajasthan mustard and gram procurement at MSP from 1 April, mustard MSP ₹6,200 a quintal
  13. Outlook Business / PTI (30 Mar 2026): SEA estimates 2025-26 rapeseed-mustard crop at 119.4 lakh tonnes, Rajasthan 53.9 lakh tonnes

In sites ko battery storage se fayda hua

Alag-alag sites, ek hi baat: apni solar aur green bijli zyada istemaal kijiye, bijli ka bill ghataiye, aur grid saath na de tab bhi kaam chalta rahe.

Apni mill aur uske solar ke baare mein bataiye

Jo pata hai bhejiye, apni mill ke liye free expert salah ke liye. Ingro ka engineer dekhta hai ki aapki solar units kahan kho rahi hain, metering ka badlav ya battery kya theek hai, aur size, keemat aur payback. Hisaab bane to baaki sab hamari team sambhalti hai: design, kisi bhi company ka saamaan, installation, DISCOM approval mein madad, commissioning, EMS aur O&M.

Aage kya hoga: hum ek working day mein phone ya WhatsApp par jawab dete hain. Abhi site visit ki zaroorat nahi, aur koi paisa nahi lagta.

Aapka solar kaise juda hai?