Solar on your rice or flour mill, held back by zero export: where the units go, and whether a battery pays

You put 100 to 500 kWp of panels on the godown and mill shed. On a clear day the inverter app shows a flat top whenever the huller line stops for lunch, the polisher waits for paddy or a shift changes over. Between seasons the mill is shut and the panels make almost nothing useful. This page is for the owner and partners of a rice mill or a roller flour or atta mill on an LT or HT industrial connection, with the munim's bill in hand. It shows where your solar goes, what your state's rules allow, which cheaper fixes to try first, and when a battery is worth it and when it is not.

Reviewed 16 November 2026 by Ingro Energy's project team

The short answer

  • On zero export, every unit your mill cannot use at that moment is thrown away by the inverter. At a mill that happens at the lunch break, at shift changes, when a line stops for paddy or wheat, on the weekly off, and for whole months in the rice off-season.
  • A battery saves about ₹7.7 for each solar unit it stores and gives back, at a grid rate of ₹9. In the worked example below, a 300 kWp plant on a mill that runs all year, that gives a payback of about 9.5 to 14 years. The same rice mill milling 6 months a year: about 19 to 29 years.
  • So for most mills the first step is not a battery. It is getting export allowed (net metering or a higher export limit), and moving flexible loads such as the colour sorter, grading and pumps into the solar hours.
  • A battery starts to make sense when export is refused or capped, the mill runs most of the year, and the mill has an evening or night shift to use the stored units, or regular daytime cuts that now start the DG.
Work it out from your mill's solar plant

Where your solar goes at noon, in mill terms

A mill's load is lumpy. The huller, polisher, whitener and elevator motors run together when paddy is flowing, and stop together when it is not. The colour sorter, grader and aspirator fans follow the line. In a roller flour mill the roller mills, plansifter and pneumatic conveying run in shifts. Solar, meanwhile, rises steadily to a peak around noon. Every time the load drops below what the panels are making, a zero-export controller cuts the inverters back, and that solar is gone.

What happens at the millWhat it does to your solar
Lunch break, line stopped at 1 pmThe load falls right at peak sun; the graph flat-tops for the hour
Shift change or cleaning stopA short dip, every working day
Huller or polisher waiting for paddy, or a breakdownIrregular dips; worst on days when paddy arrivals are thin
Weekly off or a mandi holidayAlmost the whole day's solar curtailed, once a week
Rice off-season, mill shutNearly all generation curtailed for months, with no load at night either
Flour mill on steady shiftsSmaller daily dips; the surplus mostly comes at breaks and on off days

None of this shows on the electricity bill, which is why it surprises owners. Open the inverter app on a clear milling day and on a shut day, and compare the two graphs with the panels' rated output.

Why a mill ends up on zero export

Exporting solar needs the DISCOM's approval, and the rules put limits on it. The central Electricity (Rights of Consumers) Amendment Rules, 2021 allow net metering for loads up to 500 kW or the sanctioned load, whichever is lower, and gross metering above 500 kW; each state's regulations set the details. The details are where mills get stuck: a cap on plant size as a share of your sanctioned load, a cap on how much solar can sit on one distribution transformer, or a category that is not allowed net metering at all.

When the plant is bigger than the state allows, the transformer is full, or the file is stuck, many plants are wired behind the meter with no export. A meter at the incomer watches the power flow and a controller throttles the inverters whenever the mill uses less than the panels make. Under Punjab's 2026 amendment, as reported, a behind-the-meter plant needs prior approval and any units it leaks out are neither paid nor adjusted.

In March 2026 the Ministry of Power published a draft amendment to those central rules under which states may require plants above 500 kW to add energy storage. It was a draft when this page was reviewed; check whether it has been notified.

What Punjab, Uttar Pradesh and Chhattisgarh allow: examples

These are examples from the regulations themselves or trade reports of them, with their year. Rules differ by state and by when your plant was connected, and they change often. Your connection agreement and the DISCOM's current regulations are what count.

State and ruleWhat it saysWhat it means for a mill
Punjab, PSERC rooftop regulations, 2021For non-domestic consumers the plant (inverter AC rating) may not exceed 70% of the sanctioned load or contract demand (kVA taken at 0.9 power factor). Net metering up to 500 kWp. All rooftop plants on one distribution transformer or feeder up to 80% of its rating.A mill with 300 kW sanctioned load could net-meter at most 210 kW of inverters under this rule; a bigger plant has to go on zero export or get the load raised
Punjab, 2021, net metering settlementSurplus carries forward within the settlement period. Generation above 90% of the year's consumption is not paid and lapses. Under ToD, excess in one time block is set against the next lower-tariff block.Even with net metering, a mill that generates nearly as much as it uses in a year can lose units at year end
Punjab, 1st amendment, 2024Rice shellers, rice bran stabilisation units and cotton ginning units, classed as seasonal industry in the tariff, settle from 1 April to 31 March instead of October to September.Off-season units banked from April can be used in the October to March milling months before the reset
Punjab, 2nd amendment, 2025If the transformer or service line must be upgraded for the plant, the DISCOM does it and the cost goes into its revenue requirement.A full transformer is not by itself a reason to refuse you; ask for the upgrade
Punjab, 3rd amendment, 2026 (trade report)Net metering tied to sanctioned load or contract demand with a 500 kWp ceiling. Year-end unadjusted net-metering credits paid at 75% of the feed-in tariff. Behind-the-meter plants need prior approval; leaked units are not paid.Check which version applies to your connection date before you plan
Uttar Pradesh, UPERC rooftop regulations, 2019Net metering for metered residential and agricultural consumers; others on gross metering, where all generation is exported and paid at a rate linked to large solar tariffs. Plant up to 100% of contracted demand; up to 75% of a transformer.An industrial mill could not offset its own bill through net metering under these rules; check whether a later amendment covers your category
Chhattisgarh, CSERC regulations, 2019Any consumer may net-meter, plant up to the sanctioned load or contract demand. Transformer hosting up to 100%, and the transformer is to be upgraded rather than the application refused. Battery storage allowed. Year-end surplus bought at the lowest rooftop solar tariff.Net metering should be available to most mills; zero export here is usually a paperwork problem worth chasing

The season decides almost everything

A rice mill's year follows the paddy. In Punjab, procurement of the 2026 kharif crop opened on 1 October, and custom milling for the state agencies runs on from there for as long as your allotment lasts. Then the mill goes quiet. A roller flour or atta mill buys wheat through the year and runs far more steadily.

That matters for a battery in two ways. First, a battery earns only when it can charge from the noon surplus and give the units back to a running mill the same evening or next morning. In the off-season there is a big surplus but no load to give it to, by day or by night, so the battery sits full. Second, the off-season surplus is exactly what net metering is good at: banked units carried into the milling months. Punjab's 2024 change to an April to March year for rice shellers fits that pattern.

So count your milling days honestly. A mill that runs 6 months at 26 days a month has 13 milling days a month averaged over the year, and that is the number to put in the calculator below.

A parboiling unit or a husk-fired boiler and dryer changes the load pattern too, often adding daytime motor load. Note it on the form; it is part of the sizing.

What a stored solar unit is worth on the mill's bill

A battery gives back about 85% of what goes in. With grid power at about ₹9 a unit, each solar unit stored at noon and used later saves about ₹7.7. If that unit could have been exported for a credit, take the credit off.

That makes your export arrangement the biggest number in the sum. On zero export or with a lapsing surplus, a stored unit keeps its full value. With net metering at your own rate, the grid already banks the unit for you and a battery adds little.

The calculator counts only the routine surplus on milling days. It does not count solar kept running through grid cuts, diesel saved, demand charges or ToD peak rates.

Work it out from your mill's solar plant

Five numbers from your inverter app and the bill. Nothing is sent anywhere until you ask us to check it.

Enter your plant size and the share of solar going waste to see the figures.

How this is worked out
  • Solar makes about 4.25 units per kWp on an average day. Monsoon and hazy winter days make less.
  • The share you type is the routine surplus on a milling day. Only milling days count: a rice mill that runs 6 months at 26 days should enter 13. Off-season surplus is left out because there is no load to give it to.
  • The battery is sized to hold that surplus in one charge, using about 90% of its rated kWh, and is filled and emptied once each milling day.
  • A battery gives back about 85% of what it takes in. Each unit it gives back saves the grid rate you typed; the export credit you typed is taken off for every unit no longer exported.
  • Installed cost is taken as ₹25,000 to ₹38,000 per kWh for a battery under 250 kWh, and ₹20,000 to ₹30,000 per kWh above that, before GST. This is a working range, not a quote.
  • Not counted: solar kept running in grid cuts, diesel saved, ToD peak rates, demand charges, and battery capacity fading over the years.
  • This is a first estimate. Your load pattern, motor starting, export rules and tariff are checked before anyone gives you a price.

Get your mill's figure checked

Leave your name and number. We call back with what your solar is losing and whether a battery or a cheaper fix pays at your mill.

Tell us about your mill and its solar ↓

Worked example: a 300 kWp mill on zero export, all year and seasonal

An illustration, not a real mill. Inputs: 300 kWp of panels, 20% of a milling day's solar curtailed at breaks, shift changes and line stops, 26 milling days a month, zero export, grid power at ₹9 a unit. These are the calculator's own sums, so you can type the same numbers above and get the same result.

The plant makes about 1,275 units on an average day and about 255 of them are curtailed. A 290 kWh battery holds that. If the mill runs all year, like most flour mills, the battery saves about ₹6.1 lakh a year, costs about ₹58 lakh to ₹87 lakh installed, and pays back in about 9.5 to 14 years.

Now the same rice mill milling 6 months a year, which is 13 milling days a month averaged over the year. The battery and its cost stay the same, the saving halves to about ₹3.0 lakh a year, and the payback stretches to about 19 to 29 years. In the off-season the plant makes about 38,250 units a month and on zero export nearly all of them are lost; a battery cannot save them because nothing runs.

Compare that with getting export allowed. On the milling days alone the curtailed units come to about 79,560 a year, worth about ₹7.2 lakh at the grid rate if net metering let the mill use them in full, with no battery to buy, and the off-season units on top.

Change the inputs and the answer moves a lot. An evening shift that pays peak rates, or daytime cuts that start the DG, improve the battery's case; a smaller curtailment or fewer milling days make it worse.

Try this before a battery

  • Apply for net metering, or for a higher export limit, and ask in writing why it was refused if it was. In Punjab, transformer upgrades for rooftop solar are now the DISCOM's job (2025), and rice shellers settle over April to March (2024).
  • If the plant is bigger than the share of sanctioned load your state allows, compare the cost of raising the sanctioned load with the cost of a battery.
  • Move the colour sorter, grading, packing line and bran handling into the solar hours where the process allows, and run them through the lunch hour.
  • Stagger the lunch break between the paddy line and the polishing line, or between roller mill shifts, so the whole load does not drop at 1 pm.
  • Put timers on borewell and water pumps, parboiling water filling and godown fans so they run between 11 am and 3 pm.
  • Ask your solar installer to check the export controller's margin. Every kW of margin is curtailed all day.
  • Do not add panels while you are on zero export. Each extra kWp adds mostly to the curtailment.

Huller, polisher and roller motors: what the battery inverter must handle

A mill is a room full of induction motors that start under load: hullers, polishers, whiteners, elevators, blowers and roller mills. Each one draws several times its running current for a few seconds as it starts. On the grid the transformer absorbs that. If the battery is also meant to carry the mill through a grid cut, its inverter (the PCS) has to supply those starting currents itself, so it is sized for the starting surge, not only the running kW.

The usual answers are to start motors one after another rather than all at once, to use the star-delta starters, soft starters or VFDs already on the bigger motors, and to agree with the designer exactly which motors the battery must start. If the battery only stores surplus solar and the grid is always there, this matters much less.

Husk, bran dust and heat: where the battery stands

Husk, bran and flour dust get everywhere in a mill and clog the air filters and fans that keep a battery cabinet cool. Put the cabinet in a closed, clean room or a sealed outdoor enclosure away from the husk yard, the bran room, the boiler and the dryer, out of direct sun and on a plinth above any water. Ask how often its filters need cleaning in your dust, and who does it.

Use lithium iron phosphate (LFP) cabinets with their own battery management, cooling and fire detection, and keep the area around them free of stored husk and bags. Settle the spot at the site visit, before any price is final.

Cost and battery life, briefly

As a working range, an installed system costs about ₹20,000 to ₹35,000 per kWh of battery before GST, more per kWh for small systems; what goes into that price is in our guide to battery costs in India, linked below. A solar battery at a busy mill cycles about once each milling day, so read the warranty's cycle count as closely as its years. A seasonal mill uses fewer cycles, which does not make the battery cheaper; it only stretches the payback.

When a battery is not worth it for a mill

  • Net metering or a higher export limit is available to you. Fix that first; it earns from the same surplus at a fraction of the cost.
  • Your surplus is mostly the off-season and the weekly off. A battery cannot shift units into a mill that is not running.
  • The mill runs only by day and the solar is smaller than the daytime load. There is no surplus to store.
  • The mill has no evening or night load to use the stored units, and no regular daytime cuts. The battery fills at noon and has nowhere to empty.
  • The only place for it is in the husk and dust next to the line. Solve the location first.

If cuts and the DG are the real problem at your mill and solar is secondary, the diesel sums are in our guide for a factory with a DG set.

Turnkey: one team from the first check to the last service visit

You do not need to find a battery maker, an inverter supplier, an electrician and a maintenance firm and make them agree. Ingro takes the mill's project end to end: it works out from your bill and inverter data whether net metering, a load change or a battery fits, designs the system around your solar and motors, supplies the battery from any maker with Ingro EMS, installs and commissions it, carries out the civil and electrical works, helps you with the DISCOM and electrical inspector approvals, and maintains it for the long term.

It starts with the form below: tell us about the mill, and an engineer comes back with free advice on your case. If a battery is not worth it for you, we say so.

What to ask before you sign

  • How many of my curtailed units will this catch on a normal milling day, and on which data did you work it out?
  • What does it do for me in the months the mill is shut?
  • Have you checked whether I can get net metering or a higher export limit instead, and what that would earn?
  • Is the payback worked out on my real milling days a year, or on 26 days a month for twelve months?
  • Which motors must the inverter start, and how have you sized it for the huller and polisher starting together?
  • How will the battery controller work with my export controller and reverse power relay, and who files the change with the DISCOM?
  • Where will the cabinet stand, how is it kept clear of husk and dust, and what are the warranty's years and cycles?

Useful next

Questions mill owners ask

My mill's solar graph goes flat at lunchtime. Is that zero export?

Usually, yes. When the huller and polisher stop, the export controller cuts the inverters back to match what is still running. The area above the flat top is solar thrown away.

Should I apply for net metering instead of buying a battery?

If your plant size, sanctioned load and transformer allow it, yes: it costs far less. In the worked example the curtailed units on milling days alone are worth about ₹7.2 lakh a year at the grid rate. A battery makes sense where export is refused, capped or credited low.

Will a battery use my solar in the off-season?

Not much. A battery only shifts units by a few hours, into a mill that is running. When the mill is shut there is nothing to give them to. Net metering, where it is allowed, is what carries off-season units into the milling months.

Punjab says rice shellers settle from April to March. What does that mean?

Under PSERC's 2024 amendment, rice shellers and other seasonal industries settle their net-metering account from 1 April to 31 March. Units banked in the off-season can be set against the October to March milling bills before the account resets.

Can the battery run the huller when the grid fails?

It can if the inverter is sized for the motors' starting current and the motors start one after another. That makes the inverter bigger and dearer, so decide which lines really need it.

Is there a subsidy for a battery at a rice mill?

We did not find a central or state scheme that clearly covers a battery at a rice or flour mill. Ask your state's industries or food processing department, and get it in writing before you count on it.

Sources

  1. PSERC (Grid Interactive Rooftop Solar Photo Voltaic Systems) Regulations, 2021, Punjab (Notification No. 158, 18 Aug 2021)
  2. PSERC rooftop solar (1st amendment) Regulations, 2024 (Notification No. 186, 11 Mar 2024): April to March settlement for rice shellers
  3. PSERC rooftop solar (Second Amendment) Regulations, 2025 (Notification No. 193, 20 Feb 2025): transformer upgrades by the DISCOM
  4. PowerPeak Digest (April 2026): PSERC Third Amendment, 2026, net metering ceiling, behind the meter, year-end settlement
  5. Renewable Watch (30 Jun 2021): Electricity (Rights of Consumers) Amendment Rules, 2021, net metering up to 500 kW
  6. SolarQuarter (13 Mar 2026): draft Electricity (Rights of Consumers) Amendment Rules, 2026, storage above 500 kW
  7. CBIP summary of the UPERC (Rooftop Solar PV Grid Interactive Systems Gross / Net Metering) Regulations, 2019, Uttar Pradesh
  8. pv magazine India (12 Feb 2019): UP's 2019 rules keep net metering for residential and agricultural consumers only
  9. CSERC (Grid Interactive Distributed Renewable Energy Sources) Regulations, 2019, Chhattisgarh (CBIP copy)
  10. The Week / PTI (6 Nov 2026): Punjab paddy procurement began on 1 October

Sites that have benefited from battery storage

Different sites, same idea: use more of your own renewable power, cut the electricity bill, and keep running when the grid cannot keep up.

Tell us about your mill and its solar

Send what you know. An Ingro engineer gives you free advice on your mill: where your solar is being lost, whether net metering, a load change or a battery suits you, and the size, cost and payback. If you go ahead, our team takes care of the rest, from site assessment and design to installation, help with the approvals, commissioning and O&M.

What happens next: we reply within one working day, by phone or WhatsApp. No site visit is needed at this stage, and there is nothing to pay.

Is export allowed on your solar?