A warehouse roof that could carry a megawatt, and a building that uses a fraction of it: how much solar to put up, and when a battery helps

A grade-A shed in Bhiwandi, Chakan, Farukhnagar, Hosur or Sriperumbudur has a flat roof of lakhs of square feet and a daytime load of lights, dock levellers, a few offices and some air conditioning. The panels could make far more than the building uses, and the DISCOM will not connect a plant just because the roof is big. This page is for the park developer's asset or ESG head and the tenant's facility head. It explains who pays and who saves, how big a plant your connection allows in Maharashtra, Haryana, Tamil Nadu and Karnataka, the ways to use more of the roof, and the one job a battery really has at a warehouse: charging forklifts and trucks at night.

Reviewed 16 November 2026 by Ingro Energy's project team

The short answer

  • The roof does not decide how big your solar can be; the electricity connection under it does. Maharashtra, Haryana and Karnataka cap the plant at your sanctioned load or contract demand, Tamil Nadu caps net feed-in at 999 kW, and the central rules allow net metering only up to 500 kW or the sanctioned load, whichever is lower. A 300 kVA warehouse gets about a 300 kW plant on net metering, whatever the roof could take.
  • Who saves depends on whose name is on the bill. If the tenant holds the connection, the tenant saves and the owner can only earn from the roof by leasing it or selling the solar power to the tenant. If the park holds one connection and sub-meters the tenants, the park saves and decides what to pass on.
  • A battery earns only when there is something to give the stored units to. At a warehouse that is forklift battery charging and EV trucks at night. Storing solar for a building that is dark and empty after 7 pm does not pay; exporting the surplus, or a tenant with a bigger load, is the fix.
  • In the worked example below, a 300 kWp plant with 480 units of night forklift charging, a battery pays back in about 9.4 to 14 years on stored solar. That is a case to size properly, not an automatic yes.
Work it out from your warehouse's solar

Who pays the bill and who saves: owner or tenant

In a leased warehouse the lease decides the whole case, so start there. The solar saves money for whoever pays the electricity bill on the connection it sits behind. The roof belongs to the owner; the bill often belongs to the tenant.

How the park is set upWho saves on the billHow the owner earns from the roof
Each tenant has its own DISCOM connection in its own nameThe tenantLeases the roof, or owns the plant and sells its power to the tenant. Maharashtra's 2019 regulations allow a plant owned by a third party and leased to the consumer
The park has one HT connection and sub-meters the tenantsThe park, on its own billDirectly: lower purchase cost on the units it re-bills to tenants, as the lease and the state's rules allow
Owner-occupied, or a single built-to-suit tenant on a long leaseWhoever holds the connectionUsually agreed in the lease: who funds the plant, who keeps the saving, who owns it at the end

Two questions settle most arguments before anyone talks about panels: whose name is on the electricity bill, and how many years are left on the lease. A battery pays back over years, so a tenant with three years to run will not buy one, and an owner will not buy one for a tenant who may leave.

How big a plant the roof can legally carry

Every state ties a rooftop plant to the connection it sits on. The central Electricity (Rights of Consumers) Amendment Rules, 2021 let state commissions allow net metering up to 500 kW or the sanctioned load, whichever is lower; the states set the details. Most state limits below come back to the same idea: the plant may not be bigger than the load the DISCOM has agreed to supply you.

For a warehouse that is the hard limit. A 2 lakh sq ft roof with a 300 kVA contract demand can net-meter about 300 kW, and the rest of the roof stays empty unless you use one of the routes in the next sections. Raising the contract demand only to fit more solar costs you fixed or demand charges every month on load you do not use, so check that sum before you ask for it.

There is a second limit you cannot see: how much solar the local distribution transformer can take. Maharashtra caps all rooftop plants on one transformer at 70% of its rating without a load study (2019); Haryana at 50% of the distribution transformer for LT connections and 30% of the power transformer for HT (2019). In a cluster of warehouses on one feeder, the first applicants use it up.

In March 2026 the Ministry of Power published a draft amendment to the central rules under which states may require storage with plants above 500 kW. It was a draft when this page was reviewed; check whether it has been notified before you plan a large plant.

What Maharashtra, Haryana, Tamil Nadu and Karnataka allow

These come from the regulations or trade reports of them, with their year. Rules change often and differ by connection date and supply type. Your connection agreement and the DISCOM's current regulations are what count.

State and ruleWhat it saysWhat it means for a warehouse
Maharashtra, MERC rooftop regulations 2019, amended 2023Plant up to the sanctioned load or contract demand, and up to 5 MW under net metering. Group net metering added in 2023: surplus from one premises adjusted against the same consumer's other connections in the same DISCOM area. Virtual net metering not introduced; MERC said such users should take green open access instead.An owner who holds connections at several parks in MSEDCL's area can put a bigger plant on one roof and spread the surplus. Tenants with different names cannot share it this way
Maharashtra, 2025 tariff orderFor C&I rooftop solar on ToD billing, units banked in solar hours (9 am to 5 pm) can be drawn back only in solar hours.Noon surplus cannot pay for night forklift charging through the bill. This is where a battery has a job
Haryana, HERC net-metering regulations 2019Plant up to the connected load (LT) or contract demand (HT), up to 2 MW, with a 2-hour battery for 25% of any capacity above 1 MW. Credits capped at 90% of the year's consumption and lapse at the end of the financial year. For ToD consumers, excess in one time block is carried to the same block next month.A Farukhnagar or Manesar shed whose solar makes close to what it uses in a year loses the excess at year end
Haryana, in practice (2024 to 2026)DHBVN limited net metering to 500 kW, citing the 2020 central rules. In September 2026 HERC declined to relax it for a 1,412 kW rooftop plant and pointed to gross metering.Above 500 kW, plan for gross metering or behind the meter, not net metering
Tamil Nadu, TNERC order 2021 (as reported)Net feed-in for all consumers up to 999 kW. Gross metering for HT consumers from 151 to 999 kW. Network charges on every unit generated: ₹0.83 a unit at HT, ₹1.27 at LT. New regulations were in draft in 2024.A Hosur or Sriperumbudur park pays network charges on all its solar, which lowers what each unit saves. Check which rules now apply
Karnataka, KERC DSPV regulations 2026Net metering up to the sanctioned load or 1,000 kW, whichever is lower; net billing and gross metering up to the sanctioned load. Group net metering only for connections with the same name and category; virtual net metering only for homes, charities and government. Behind the meter: up to the sanctioned load, or more if a battery or a grid-forming inverter gives the solar its own voltage reference.The one rule here that lets a battery put more panels on the roof than the connection allows, behind the meter

Using more of the roof: the routes that exist

  • Give each tenant its own plant. In a multi-tenant park, a plant on each tenant's connection, sized to that tenant's load, uses more of the roof than one plant on the park's common connection. Each is a separate application.
  • Group net metering, where it exists. In Maharashtra (from 2023) and Karnataka (2026) an owner with several connections in its own name in the same DISCOM area can generate on one roof and use the surplus at the others.
  • Gross metering. All the solar is sold to the DISCOM at a set rate and your load is billed separately. Haryana pointed a 1,412 kW rooftop plant to it in 2026; Tamil Nadu offers it to HT consumers up to 999 kW. It earns at the DISCOM's rate, not at what you pay for a unit.
  • Behind the meter with a battery. Karnataka's 2026 regulations allow solar beyond the sanctioned load behind the meter if storage or a grid-forming inverter provides the voltage reference. It only pays if the building can use those extra units by day or at night; otherwise they are curtailed.
  • A bigger load under the roof. A tenant with cold rooms, a light assembly line or a truck charging depot uses more solar by day, which raises both the useful plant size and the case for everything else on this page.

Green open access is the other way round: it brings green power in from a plant elsewhere. Since the Ministry of Power's 2022 rules, consumers with a contract demand of 100 kW or more can buy it, with banking of surplus. For a tenant whose ESG target is bigger than its share of the roof, that may be the cheaper route to its renewable share.

Forklifts and EV trucks at night: the battery's real job

A warehouse's daytime load is small and its evening load is smaller, with one exception: the forklift fleet goes on charge after the last shift, and a fleet of electric trucks plugs in at the depot when it comes back. That is a large, regular load that comes every working night, exactly when the solar has stopped.

Under ordinary net metering the noon surplus would be banked and set off against those night units. Where it cannot be, a battery does it instead. That happens in three situations: the plant is behind the meter with no export; the state's ToD rule keeps noon credit out of the night hours (Maharashtra for C&I on ToD billing from 2025; Haryana carries ToD credit only to the same time block); or exported units lapse at year end (Haryana above 90% of consumption).

How the fleet charges matters. Lead-acid forklift batteries are usually charged in one long block after the shift. Lithium-ion forklifts can be topped up in breaks during the day, which moves part of that load into solar hours by itself, without a building battery. If the fleet is due for replacement, ask that question first.

EV trucks are the bigger change coming. A depot of electric trucks charging at night can need more power than the warehouse's whole connection, which is a connection question before it is a solar one. Our guide on EV charging hubs and fleet depots covers that side.

If your building is dark after the last shift, with no forklift charging and no trucks, a battery has nothing to give its stored units to. It fills at noon and sits full. Do not buy one; put the effort into export approval or a tenant with a bigger load.

What a stored solar unit is worth to the warehouse

A battery returns about 85% of what goes in, so with grid power at about ₹9 a unit, each solar unit stored at noon and given to the night charging saves about ₹7.7. If that unit would otherwise have earned an export or banking credit you could use, take the credit off.

Two things specific to warehouses push the number down. If your tariff gives a night rebate or a lower off-peak rate, the night unit the battery replaces is cheaper than your average unit; use the night rate in the calculator. In Tamil Nadu, network charges on generated units also come off what each solar unit saves.

Your situationWhat a stored solar unit saves
Behind the meter or zero export, with night forklift or truck chargingabout ₹7.7, the full value after losses
Net metering, but noon credit cannot be used at night (ToD banking rules)about ₹7.7 less whatever the stranded credit is finally worth
Net metering with credit usable at any hour, never lapsinglittle or nothing: the bill already does the battery's job
No night load at allnothing: the stored units have nowhere to go

The calculator assumes every stored unit is used at night. Enter as surplus only what your night load can take: forklift and truck charging units a night, not the whole roof's curtailment.

Work it out from your warehouse's solar

Five numbers from your inverter app and the bill. Count only the surplus your night forklift or truck charging can use. Nothing is sent anywhere until you ask us to check it.

Enter your plant size and the share of solar your night load could use to see the figures.

How this is worked out
  • Solar makes about 4.25 units per kWp on an average day. Monsoon and cloudy days make less.
  • The share you type is the routine surplus on a working day that the night load can use. Only working days are counted; weekly-off and holiday surplus is left out.
  • The battery is sized to hold that surplus in one charge, using about 90% of its rated kWh, and is filled by day and emptied into the night charging once each working day.
  • A battery gives back about 85% of what it takes in. Each unit it gives back saves the grid rate you typed; the export credit you typed is taken off for every unit no longer exported.
  • Installed cost is taken as ₹25,000 to ₹38,000 per kWh for a battery under 250 kWh, and ₹20,000 to ₹30,000 per kWh above that, before GST. This is a working range, not a quote.
  • Not counted: network charges on solar, demand charges, solar kept running in grid cuts, diesel saved, and battery capacity fading over the years.
  • This is a first estimate. Your connection, export rules, night load and tariff are checked before anyone gives you a price.

Get free advice on your park

Leave your name and number. We call back with how much solar your connection allows and whether a battery pays, and work out the complete solution if you want it.

Tell us about your warehouse or park ↓

Worked example: a 300 kWp warehouse with night forklift charging

An illustration, not a real park. A grade-A warehouse with a 300 kVA contract demand has 300 kWp on the roof, the most its connection allows, connected behind the meter with zero export, and buys grid power at ₹9 a unit. The roof could take far more. These are the calculator's own sums: type the same numbers above and you get the same result.

The plant makes about 1,275 units on an average day. Lights, docks, offices and air conditioning use about 893 of them as they are made; the other 30%, about 383 units, is curtailed on each of 26 working days a month. At night the forklift fleet charges at about 80 kW for 6 hours, about 480 units, so the 325 units a battery gives back are all used.

A 430 kWh battery holds that surplus. It saves about ₹9.1 lakh a year, costs about ₹86 lakh to ₹1.29 crore installed, and pays back in about 9.4 to 14 years. Worth sizing properly; not a quick win.

If the same surplus could be exported at ₹3 a unit instead, the battery saves only about ₹5.5 lakh a year and the payback stretches to 15 to 23 years. So if export approval can be had, take it first.

Now fill the roof: 1,000 kWp behind the meter would make about 4,250 units on an average day. After the building's daytime use and everything the night charging can take from a battery, about 2,793 units a day would still have nowhere to go. No battery fixes that; only export or a bigger load does.

Not counted: ToD or night rates different from the average rate, network charges, demand charges, solar kept running in grid cuts, diesel saved, and battery capacity fading over the years.

When a battery is not worth it at a warehouse

  • The building has no night load: no forklift charging, no trucks, lights only. A battery to store solar for an empty building does not pay.
  • You are on net metering and the credit can be used at any hour without lapsing. The bill already moves noon units to the night.
  • The fleet is moving to lithium-ion forklifts that charge in the daytime breaks. The night load the battery was meant for shrinks.
  • The lease has only a few years left, or nobody has agreed who owns the battery when the tenant leaves.
  • The plan is a battery so that a much bigger plant can go on the roof, with no load to use the extra units. Export, group net metering or a bigger tenant load comes first.

If your real problem is daytime grid cuts and the DG, not surplus solar, the diesel sums are in our guide for a factory with a DG set. Zero export, the export controller and solar in grid cuts are explained in more detail in our guide for a factory with rooftop solar.

Green leases and the tenant's ESG report

Many tenants of grade-A parks report their emissions and ask the landlord for renewable power. A green lease puts that in writing: who installs the solar, who keeps the saving, how the tenant gets the data for its report, and who owns the equipment at the end of the term.

IGBC has a rating system for logistics parks and warehouses, with Energy Efficiency among its categories and separate tracks for owner-occupied and tenant-occupied projects and tenant fit-outs. If a rating is part of the plan, ask your IGBC consultant which credits on-site solar and storage count towards before the design is fixed.

Solar on the roof counts towards the tenant's renewable share only for the units it actually uses. Units curtailed by an export controller count for nobody, which is one more reason to size the plant to what can be used or exported.

Cost and battery life, briefly

As a working range, an installed system costs about ₹20,000 to ₹35,000 per kWh of battery before GST; what goes into that price is in our guide to battery costs in India. A battery serving night forklift charging cycles once every working day, so read the warranty's cycle count as closely as its years. In a leased park, agree before you buy who maintains it and what happens to it when the lease ends.

What a turnkey project covers for your park

You do not need to manage a solar installer, a battery supplier, an electrical contractor and the DISCOM paperwork separately, or settle between them who answers for what. Ingro works out from your bills, connection and night load whether export, group net metering, a per-tenant plant or a battery suits the park, then designs, integrates, commissions and maintains the system, with any maker's battery and Ingro EMS. Ingro does not make batteries.

It starts with the form below: free expert advice on your park. If a battery does not pay for your building, we say so.

What to ask before you sign

  • Whose connection will the plant sit on, and what is the largest plant that connection allows under my state's current rules?
  • Have you checked export first: net metering, net billing, gross metering or group net metering, and what each would earn?
  • How many stored units a night will my forklifts and trucks actually use, and from which data did you work it out?
  • Is the payback worked out at my night or off-peak rate and my real export credit, or at an average grid rate?
  • Who owns the plant and the battery, who maintains them, and what happens to both if the tenant leaves?
  • What happens to my existing net-metering or behind-the-meter approval when a battery is added, and who files the change with the DISCOM?
  • What is the warranty in years and in cycles, and who comes when it stops?

Read next, and see the equipment

Questions warehouse owners and tenants ask

Our roof could take 1 MW. Why will the DISCOM only connect 300 kW?

Because rooftop plants are capped at the connection's sanctioned load or contract demand, not the roof's size, in Maharashtra, Haryana and Karnataka (Tamil Nadu caps net feed-in at 999 kW), and the central rules allow net metering only up to 500 kW or the sanctioned load, whichever is lower. To use more roof you need group net metering, gross metering, per-tenant plants or a bigger load.

Can we sell the extra solar to our tenants?

Where each tenant has its own connection, the plant can sit on the tenant's connection and be owned by the landlord as a third party; Maharashtra's 2019 regulations allow that. Group net metering in Maharashtra and Karnataka works only between connections of the same consumer, so it does not let you share surplus among tenants with different names.

Will a battery let us put more panels on the roof?

In Karnataka, behind the meter, yes: the 2026 regulations allow solar beyond the sanctioned load if a battery or grid-forming inverter gives the voltage reference. But the extra units are only worth something if the building or the night charging uses them. Without that load, a bigger plant with a battery still curtails.

We charge forklifts every night. Does a battery make sense?

It is the best reason a warehouse has. If your noon surplus cannot reach the night through the bill (zero export, ToD banking rules, lapsing credit), a battery moves it there. Size it to the night charging, not the roof. If the fleet is moving to lithium-ion forklifts that charge in daytime breaks, check that first.

Our tenant wants 100% green power. Can the roof do it?

Rarely on its own: the plant is capped by the connection and makes nothing at night. A tenant with a contract demand of 100 kW or more can also buy green power through green open access under the Ministry of Power's 2022 rules, alongside what the roof supplies.

Who pays for the battery, the owner or the tenant?

Whoever saves on the bill, which is whoever holds the connection. Put ownership, maintenance and what happens at lease end in the green lease before anything is bought.

Sources

  1. Renewable Watch (30 Jun 2021): Electricity (Rights of Consumers) Amendment Rules, 2021, net metering up to 500 kW or the sanctioned load, whichever is lower
  2. SolarQuarter (13 Mar 2026): draft Electricity (Rights of Consumers) Amendment Rules, 2026, storage above 500 kW
  3. MERC (Grid Interactive Rooftop Renewable Energy Generating Systems) Regulations, 2019, Maharashtra: plant up to sanctioned load or contract demand (reg. 6.2), 70% transformer limit, third-party ownership, storage with isolation (reg. 7.2)
  4. MERC, Statement of Reasons, First Amendment to the rooftop regulations (2023): 5 MW net-metering cap, group net metering introduced, virtual net metering not introduced
  5. Saur Energy (1 July 2025): Maharashtra tariff order, units banked in solar hours drawn back only in solar hours (C&I on ToD billing)
  6. HERC (Rooftop Solar Grid Interactive Systems Based on Net Metering) Regulations, 2019, Haryana (25 Oct 2019): clauses 5.2, 5.3 and 11.1
  7. SolarQuarter (22 Sep 2026): HERC declines to relax the 500 kW net-metering ceiling for a 1,412 kW rooftop plant, points to gross metering
  8. DT Next (Oct 2021): TNERC rooftop solar order, net feed-in up to 999 kW, gross metering for HT consumers from 151 to 999 kW, network charges on generated units
  9. SolarQuarter (15 Jun 2024): TNERC draft Grid Interactive Solar PV Energy Generating Systems Regulations, 2024, to replace the 2021 regulations
  10. KERC (Grid Interactive Distributed Solar Photovoltaic (DSPV) Plants) Regulations, 2026, Karnataka (notified 19.08.2026): clauses 4.1 to 4.7
  11. Renewable Watch (7 Jun 2022): Ministry of Power notifies the Green Energy Open Access Rules, 2022, open access from 100 kW
  12. IGBC Green Logistics Parks and Warehouses Rating System: categories, owner- and tenant-occupied projects, interior fit-outs

Sites that have benefited from battery storage

Different sites, same idea: use more of your own renewable power, cut the electricity bill, and keep running when the grid cannot keep up.

Tell us about your warehouse or park

Send what you know. An Ingro engineer gives you free expert advice on your site: how big a plant your connection allows, whether export, group net metering, per-tenant plants or a battery for the night charging suits you, and the size, cost and payback. If you go ahead, our team takes care of the rest: design, equipment from any maker, installation, help with the approvals, commissioning, Ingro EMS and O&M.

What happens next: we reply within one working day, by phone or WhatsApp. No site visit is needed at this stage, and there is nothing to pay.