Policy that moves solar & storage

Orders, rules and schemes from the Ministry of Power, MNRE and others, each with a line on what it changes for you. Always check the issuing body's site for the current text.

31 notifications · page 3 of 4

  1. Jun 2023

    Ministry of Power

    Carbon Credit Trading Scheme, 2023

    Sets up the Indian carbon market under the Energy Conservation Act, 2001. Notified obligated entities get greenhouse-gas targets; others may buy certificates voluntarily.

    What it changes: Plants with emission-intensity targets can use solar and storage to cut emissions instead of buying carbon credits.

    SolarOfficial PDFDetails
  2. Jun 2023

    Ministry of Power

    Time-of-Day tariff: Electricity (Rights of Consumers) Amendment Rules, 2023

    Makes Time-of-Day tariffs compulsory. C&I consumers above 10 kW maximum demand move to ToD tariffs no later than 1 April 2024.

    What it changes: Peak rates at least 20% above normal and solar-hour rates at least 20% below give C&I sites a clear gap for EMS-scheduled battery charging and peak shaving.

    StorageEMSSolarpib.gov.inDetails
  3. May 2023

    Ministry of Power

    Green Energy Open Access (Second Amendment) Rules, 2023

    Consumers can add up several connections to reach the 100 kW threshold for green open access. Captive consumers have no load limit.

    What it changes: C&I sites with several smaller connections in one discom division can combine them to qualify for green open access.

    Open accessSolarOfficial PDFDetails
  4. May 2023

    CERC

    Indian Electricity Grid Code, 2023

    A new grid code for planning, connection, commissioning, scheduling and operation, treating energy storage as its own class of grid user. In force from 1 October 2023.

    What it changes: Commissioning a storage or RE plant depends on working plant controllers, telemetry and active-power control, all delivered through the EMS.

    StorageEMSSolarGridOfficial PDFDetails
  5. Aug 2022

    MoEFCC

    Battery Waste Management Rules, 2022

    Extended producer responsibility for all battery types, including EV and industrial batteries: collection, recycling targets and minimum recycled content.

    What it changes: Battery makers and importers must register and meet EPR targets; end-of-life tracking matters.

    BatteriesOfficial PDFDetails
  6. Jul 2022

    Ministry of Power

    Renewable purchase obligation and energy storage obligation to 2029-30

    RPO trajectory for distribution companies and open-access consumers, with a separate energy storage obligation rising each year.

    What it changes: Discoms and large consumers must hold a growing share of energy from storage charged by renewables.

    StorageOpen accessOfficial PDFDetails
  7. Jun 2022

    Ministry of Power

    Green Energy Open Access Rules, 2022

    Lowers the open-access threshold to 100 kW, sets time-bound approvals and caps additional charges for green power.

    What it changes: Mid-sized C&I sites can buy renewable power through open access; storage firms up the supply.

    Open accessSolarOfficial PDFDetails
  8. May 2022

    CERC

    Renewable Energy Certificate Regulations, 2022

    Resets the REC system: one certificate per MWh of renewable power. In force from 5 December 2022.

    What it changes: Captive solar owners and open-access buyers beyond their obligation can get RECs, but certificates for self-consumed power cannot be sold.

    SolarOpen accessOfficial PDFDetails
  9. Mar 2022

    Ministry of Power

    Guidelines for procurement and use of battery energy storage systems

    Standard bidding framework for BESS as generation, transmission or distribution assets and for ancillary services.

    What it changes: The basis for most state and central BESS tenders since.

    StorageGridOfficial PDFDetails
  10. Jan 2022

    CERC

    Ancillary Services Regulations, 2022

    Secondary and tertiary reserve services procured through the market, open to energy storage and demand response. Most provisions in force from 5 December 2022.

    What it changes: A BESS can earn ancillary-services revenue if its EMS supports two-way RLDC communication, SCADA telemetry and a 30-second response.

    StorageEMSGridOfficial PDFDetails