Polyhouse cluster ke liye solar aur battery: feeder ke ghanton ke baahar fan, fogger aur cold room chalana
Aapke polyhouse 10 se 50 acre mein capsicum, kheera ya phool ugaate hain. Pump, fertigation unit, climate fan aur fogger, aur aksar pack-house ki grading line aur cold room bhi, sab ek agricultural feeder par hain jo din mein 7 ya 8 ghante three-phase deta hai, aur kuch hafton mein woh ghante raat ko hote hain. Garam dopahar ko feeder band hote hi fan ruk jaate hain; ya to DG chalta hai ya fasal garmi jhelti hai. Yeh page FPO ke CEO aur board ke liye hai, ya agri-business ke maalik ke liye, jo cluster ke liye solar ke saath battery (BESS) soch rahe hain. Isme hai ki battery kya chalayegi, har connection par ek unit aapko kitne ki padti hai, schemes kis cheez ka paisa deti hain aur kis ka nahi, aur battery kab bekaar hai.
16 November 2026 ko Ingro Energy ki project team ne check kiya
Seedha jawab
- Rostered agricultural feeder par battery ka kaam hai cluster ko un ghanton mein chalana jab feeder three-phase nahi deta: garam dopahar ko fan aur fogger, raat bhar cold room, maal aane par grading line. Pack-house aur shade-net ki chhat ka solar use charge karta hai.
- Jahan pump ki bijli free hai, wahan battery pump ke bill par kuch nahi bachati. Paisa pack-house mein hai (Maharashtra mein greenhouse ya farm cold store ka bill lagbhag ₹7.21 ek unit) aur sabse zyada diesel mein: DG ki ek unit sirf diesel mein lagbhag ₹30 ki padti hai.
- Hamare example cluster mein 200 kWp solar ke saath lagbhag 290 kWh ki battery, agar sirf grid units bachaye, to saal mein lagbhag ₹5.6 lakh bachati hai, payback 10 se 15 saal. Agar saal ke 120 garam dinon mein DG bhi band rakhe, to bachat lagbhag ₹11 lakh aur payback 5.1 se 7.6 saal.
- Koi scheme battery ka naam lekar paisa nahi deti, jitna humne dekha. PM-KUSUM solar pump aur solar plant ka paisa deti hai; MIDH polyhouse, pack-house aur cold room ka; Agriculture Infrastructure Fund FPO ko 3% interest subvention deta hai aur eligible infrastructure ke solarisation ko bhi finance kar sakta hai.
Aapke feeder ka schedule: three-phase asal mein kab aata hai
Zyaadatar polyhouse cluster agricultural feeder par hote hain, aur agri feeder ka roster hota hai. Maharashtra mein MSEDCL ke July se September 2025 ke schedule mein agricultural load-management feeder ko 8 ghante three-phase milta hai, din mein ya raat mein, aur division ke andar din aur raat ke slot har hafte badalte hain. Jahan technically ho sake, yeh 8 ghante sirf din mein, 08:00 se 18:00 ke beech dene hain; Mukhyamantri Saur Krishi Vahini Yojana 2.0 mein solarise hue feeder ko solar plant commission hone ke agle din se din ki supply milti hai.
Karnataka mein state ki policy hai ki agricultural pump sets ko roz saat ghante three-phase mile, aur KUSUM-C mein substations solarise ho rahe hain taaki yeh saat ghante din mein aa sakein. Kaagaz ka niyam aur May mein aapka feeder do alag cheezein ho sakti hain.
- Ek mahine tak apne feeder ke asli three-phase ghante likhiye: kab shuru, kab band, aur kaunse hafte raat ko.
- Jo ghante nuksaan karte hain unhe mark kijiye: garam dopahar aur fan band, raat wala hafta aur cold room DG par, harvest ki subah dock par maal aur grading line ke liye bijli nahi.
- Dekhiye kaunsa load kis connection par hai. Kai cluster mein pump agri feeder par hain aur pack-house alag connection par; kuch mein sab ek hi par.
Agar aapka pack-house 24 ghante wale gaon ya express feeder par hai aur bas aam power cut aate hain, to uska sawaal hamari cold storage aur DG guides wala hai. Yeh page un loads ke baare mein hai jo rostered feeder par chalte hain.
Three-phase jaate hi kya rukta hai, aur aapko kitna padta hai
Feeder ke three-phase ghante khatam hote hi sab three-phase ruk jaata hai: climate fan, high-pressure fogger pump, borewell aur fertigation pump, cold room ka compressor, grading line. Grid-tied solar inverter bhi ruk jaata hai, dopahar ko bhi, kyunki jis grid ke saath woh chalta hai woh gayab ho jaye to woh band ho jaata hai. Isliye raat-supply wale hafte mein pack-house ki chhat ke panel sabse garam waqt mein khaali baithe reh sakte hain.
Har load ka nuksaan alag hai. Drip ka schedule theek bana ho to pump agle slot ka intezaar kar sakte hain. Garam dopahar ko fan aur fogger nahi. Din ki harvest rakhe cold room ka compressor chhe ghante band nahi reh sakta. Solar se charge hui battery in loads ko, aur solar plant ko, feeder band hone par bhi chalne deti hai.
Feeder ke ghante khatam hone par cluster kaun chalata hai
Bhara hua teer dikhata hai load kaun utha raha hai. Dashed teer backup mein khada DG hai.
Battery kya chalayegi, aur kya feeder ke liye chhodegi
Yeh list sahi banana hi sizing ka aur keemat ka zyaadatar hissa hai. Cluster mein kuch load feeder ke ghanton ke baahar chalne hi chahiye, aur kai unhi ghanton mein khisakaye ja sakte hain.
| Load | Battery par? | Kyun |
|---|---|---|
| Climate fan aur fogger pump | Haan, garmi ke mahino mein | Feeder band ho aur dopahar garam ho to fasal ki hifazat yahi hai. |
| Staging cold room ya pre-cooler | Haan | Dispatch ke intezaar wali harvest raat wale hafte mein bhi thandi rehni chahiye. |
| Grading aur packing line, kaanta | Haan, jitne ghante chalti hai | Maal apne time par aata hai, feeder ke time par nahi. |
| Drip aur fertigation pump | Aam taur par nahi | Pump three-phase ke ghanton mein schedule ho sakte hain; jahan unki bijli free hai, battery par chalana bachat se mehenga padta hai. |
| Borewell pump | Nahi | Bada motor, lambe ghante, aur aksar free bijli. Feeder ya solar pump par rakhiye. |
| Office, light, sensor, controller | Haan, chhota | Climate controller aur monitoring har baar feeder badalne par reboot nahi hone chahiye. |
Enquiry ke saath fan, fogger pump, cold room compressor aur grading line ka kW aur starter type bhej dijiye. Saath mein start hone wale motors dekh kar engineer inverter tay karta hai; yeh hisaab aapko khud nahi lagana.
Ek unit kitne ki padti hai: free pump, metered pack-house
Bachat is par tikti hai ki har load kis tariff par hai, aur farm cluster mein yeh sabse zyada badalta hai. Maharashtra mein 7.5 HP tak ke agricultural pump wale kisano ko Mukhyamantri Baliraja scheme mein April 2024 se March 2029 tak free bijli milti hai. Karnataka mein March 2026 ke tariff revision ke baad bhi 10 HP tak ke pump sets ko free bijli jaari hai. Jo bijli pehle se free hai, us par battery paisa nahi bacha sakti.
Pack-house aur polyhouse khud aksar alag category mein hote hain. MERC ke 2023 tariff order mein Maharashtra ki LT IV(C) "Agriculture Others" category mein krishi upaj ke pre-cooling plant aur cold storage aate hain, aur high-technology agriculture jaise greenhouse aur tissue culture, bashartein bijli sirf fasal ugane mein lage, kisi industrial process mein nahi. Floriculture, horticulture, nursery aur plantation ko sasti LT IV(B) metered agriculture category mein daala gaya. FY 2026-27 ke liye MERC ka rate LT IV(B) ka lagbhag ₹4.02 aur LT IV(C) ka lagbhag ₹7.21 ek unit hai, energy aur wheeling charge milakar, fuel adjustment aur duty se pehle.
| Unit kahan se | Ek unit ki keemat (Maharashtra, FY 2026-27) |
|---|---|
| 7.5 HP tak ka agricultural pump | Baliraja scheme mein free |
| LT IV(B) metered agriculture (floriculture, horticulture, nursery) | lagbhag ₹4.02 |
| LT IV(C) agriculture others (greenhouse, farm cold storage) | lagbhag ₹7.21 |
| DG set (sirf diesel) | lagbhag ₹30 |
Payback nikalne se pehle har bill par chhapi category dekh lijiye. Connection kaise sanction hua, us hisaab se wahi grading line alag rate par bill ho sakti hai.
Pack-house aur shade-net par solar: yahan battery kyun chahiye
Pack-house ki chhat, shade-net ke structure aur parking shed panel ke liye sahi jagah hain, aur zyaadatar cluster pehle solar hi sochte hain. Rostered feeder par akele solar mein do kami hain. Jin hafton mein three-phase raat ko aata hai, grid-tied plant din mein chal hi nahi sakta. Jin hafton mein din mein aata hai, plant dopahar ko sabse zyada banata hai jabki cold room ki sabse bhaari mehnat raat ko hoti hai.
Aisa inverter jo site ki apni supply bana sake, battery ke saath dono kami door karta hai: feeder band hone par bhi panel fan aur cold room chalate rehte hain, aur dopahar ka bacha hua shaam ke liye store hota hai. Maujooda inverter, battery aur feeder kaise jude, yeh site dekh kar engineer ka kaam hai, page padh kar khud karne ka nahi. Cut mein solar kyun rukta hai aur zero export par units kyun jaate hain, yeh hamari rooftop solar wali factory ki guide mein hai.
Apne solar plant se hisaab lagaiye
Pack-house ka solar plant daaliye (ya jo plan kar rahe hain), din ke solar ka kitna hissa aaj kaam nahi aata kyunki feeder band hai ya load kam hai, aur pack-house ke bill ka rate. Farm har din chalta hai, isliye mahine ke 30 din daaliye. Agar feeder ke ghanton ke baahar DG fan ya cold room chalata hai, to har stored unit grid rate se kahin zyada ki hai; neeche ka example dikhata hai kitni.
Pack-house ke solar se hisaab lagaiye
Inverter app aur pack-house ke bill se paanch aankde. Jab tak aap check karne ko na kahein, kuch kahin nahi jaata.
Aankde dekhne ke liye plant ka size aur bekaar solar ka hissa daaliye.
Hisaab kaise lagaya
- Ek aam din mein solar per kWp lagbhag 4.25 unit banata hai. Monsoon aur badli mein kam.
- Jo hissa aap daalte hain woh aam din ka bekaar solar hai. Battery use ek charge mein rakhne layak size ki hai, rated kWh ka lagbhag 90% use karke, aur roz ek baar bharti aur khaali hoti hai.
- Battery jo leti hai uska lagbhag 85% wapas deti hai. Wapas di har unit aapka daala rate bachati hai; export credit ho to ghata diya jaata hai.
- Lagwane ka kharcha 250 kWh se chhoti battery ke liye ₹25,000 se ₹38,000 per kWh, aur usse badi ke liye ₹20,000 se ₹30,000 per kWh, GST se pehle. Yeh mota range hai, quote nahi.
- Ginti mein nahi: DG ki jagah bacha diesel, garmi se bachi fasal, scheme ki madad, aur saalon mein battery ki ghatti capacity.
- Yeh pehla andaaza hai. Keemat batane se pehle aapke feeder ka schedule, load aur tariff category check hoti hai.
Apne cluster ke liye free salah lijiye
Naam aur number chhodiye. Engineer aapke feeder, load aur poore solution ke baare mein size, kharche aur payback ke saath call karega.
Apne polyhouse cluster ke baare mein bataiye ↓Example: 20 acre ka cluster, ek saanjha pack-house
Yeh ek misaal hai, koi asli FPO nahi. Inputs: pack-house ki chhat aur shade-net par 200 kWp solar, polyhouse wale hi rostered feeder par; din ke solar ka lagbhag 30% aaj bekaar, feeder band wale din ke ghanton aur dopahar ke us surplus mein jo pack-house use nahi kar pata; mahine ke 30 din; export ka koi credit nahi; pack-house LT IV(C) par ₹7.21 ek unit. Aankde calculator wale hi hisaab se aate hain.
- Solar banta hai: lagbhag 850 unit roz. Aaj bekaar aur battery pakad sakti hai: lagbhag 255 unit roz.
- Use rakhne ke liye battery: lagbhag 290 kWh. Lagwane ka kharcha: GST se pehle lagbhag ₹58 lakh se ₹87 lakh.
- Agar har stored unit sirf ₹7.21 wali grid unit bachaye: saal mein lagbhag ₹5.6 lakh, payback 10 se 15 saal. Sirf grid units par yeh dheema hai.
- Agar saal ke 120 garam dinon mein yahi units us DG ki jagah lein jo feeder ke baahar fan, fogger aur cold room chalata (diesel lagbhag ₹30 ek unit), aur baaki saal grid units: saal mein lagbhag ₹11 lakh, payback 5.1 se 7.6 saal.
Fasal ginti mein nahi hai. Ek garam dopahar mein capsicum ya gulab ka ek batch, ya cold room mein kharab hua maal, upar ki saal bhar ki bachat se zyada ka ho sakta hai. Ise sirf apne record se giniye, aur kabhi vaade ki tarah nahi.
PM-KUSUM, MIDH aur Agriculture Infrastructure Fund: kaun kis cheez ka paisa deta hai
FPO ka lagbhag har faisla capital subsidy se tay hota hai, isliye yahan hai ki chhape hue niyamon ke hisaab se har scheme kya fund karti hai. Koi bhi pack-house ki battery ka naam nahi leti.
- PM-KUSUM Component A: kisano ki zameen par substation ke paas 500 kW se 2 MW ke solar plant, kisan, group, cooperative ya panchayat lagate hain, aur bijli DISCOM ko state regulator ke tay rate par bikti hai. Incentive DISCOM ko jaata hai, aapko nahi.
- PM-KUSUM Component B: jahan grid pump nahi hai wahan standalone solar pump. Central assistance benchmark ya tender cost ka 30% hai (North-East aur Himachal Pradesh, Uttarakhand jaise pahadi rajyon mein 50%), aur state aam taur par apna hissa jodta hai.
- PM-KUSUM Component C: grid wale pump ka solarisation, akele pump par (pump ke kW ka do guna tak solar, solar PV hisse par 30% central assistance, pahadi rajyon mein 50%) ya feeder level par. Assistance solar hisse ke liye hai. March 2026 ki reports ke mutabik maujooda scheme mein battery ka provision nahi hai aur PM-KUSUM 2.0 ke liye do se chaar ghante ki battery par baat chal rahi thi; koi notified niyam humein abhi nahi mila.
- MIDH (NHB aur state horticulture mission ke zariye): 2,500 sq m se bade polyhouse par cost ka 50%, ek project par ₹56 lakh tak; pack house par 50%; integrated pack house, pre-cooling unit ya staging cold room par general area mein 35% aur pahadi aur scheduled area mein 50%, bank loan se juda aur baad mein milne wala (credit-linked, back-ended). Yeh structure aur cold chain ka paisa hai, battery ka nahi.
- Agriculture Infrastructure Fund: ₹2 crore tak ke loan par saat saal tak 3% saalana interest subvention, FPO ke liye khula, aur polyhouse, pack house, cold chain, sorting aur grading unit eligible projects mein hain. 2023 ki guidelines kehti hain ki kisi bhi eligible infrastructure ka solarisation bhi finance ho sakta hai. Battery us solarisation mein ginti hai ya nahi, yeh aapka bank batayega.
Schemes badalti rehti hain, aur har state unhe apne tareeke se chalata hai. Board kisi bhi scheme par budget banaye, usse pehle state horticulture mission, DISCOM ya nodal agency aur bank se poochh lijiye.
Sign kaun karta hai: FPO board, bank aur subsidy sanction
FPO mein aam taur par CEO case banata hai, aur itne bade kharche ke liye board of directors ka resolution chahiye. Agar project subsidy ya AIF loan par tika hai to kram zaroori hai: bank ka appraisal aur loan sanction, aur scheme ki approval, aam taur par order dene se pehle aate hain, kyunki credit-linked subsidy project banne aur check hone ke baad milti hai. Kaun kya approve kar sakta hai, yeh apne articles of association aur scheme ke niyam mein dekhiye.
Board ke saamne teen aankde rakhiye, har ek ka hisaab saath mein:
- Kharcha, ek jaise scope wale turnkey quotation se: wahi load, feeder ke baahar wahi ghante, wahi solar plant.
- Saal ki bachat, aapke bill aur DG ke diesel register se, pack-house units aur diesel alag alag.
- Fasal wala hissa: pichhle season garmi ya garam cold room se kitna nuksaan hua, aapke apne record se. Alag dikhaiye, bachat mein mat jodiye.
Polyhouse cluster ke liye battery kab bekaar hai
- Aapke bade load sirf free agri bijli wale pump hain, aur woh feeder ke ghanton mein schedule ho sakte hain. Bachane ko kuch nahi; PM-KUSUM ka solar pump zyada theek baithta hai.
- Cluster chhota hai: kuch acre, kuch fan, cold room nahi. Battery 50 kW se kaafi neeche hogi, is page ke daayre se chhoti.
- Aapka feeder pehle se bharose ke saath din mein three-phase deta hai (jaise solarise hua MSKVY ya KUSUM-C feeder), pack-house 24 ghante wale connection par hai, aur koi DG nahi chalta. Battery ke paas karne ko zyada kuch nahi.
- Solar nahi hai aur lagane ka plan bhi nahi. Sirf feeder ke ghanton mein charge hui battery raat wala hafta to nikaal degi, par har stored unit aapko ek grid unit aur nuksaan ke barabar padegi.
- Dikkat polyhouse ki apni cooling mein hai: phate pad, chhote fan, kharab ventilation. Pehle use theek kijiye; jo house poori bijli par bhi garam ho jaata hai, battery use thanda nahi kar sakti.
DG hai to rakhiye. Battery feeder ke baahar ka roz ka gap sambhalti hai, aur DG sirf lambi outage ya lagataar badli wale dinon mein chalta hai.
Keemat aur battery ki umar, thode mein
Mote taur par lagi hui system GST se pehle lagbhag ₹20,000 se ₹35,000 per kWh battery padti hai, chhoti system mein per kWh zyada; turnkey keemat mein kya aata hai, yeh battery cost guide mein hai. Apna battery management, cooling aur fire detection wale lithium iron phosphate (LFP) cabinet aam pasand hain. Garmi battery ki umar ghatati hai, aur May mein Nashik ka pack-house garam hota hai: cabinet ko chhaanv, hawa aur dhone ke paani aur khaad ke store se door plinth chahiye.
FPO ke liye turnkey project mein kya kya aata hai
Aapki team fasal ugaati aur bechti hai; use electrical project sambhalna nahi padna chahiye. Turnkey project mein Ingro ki team aapke feeder ke schedule aur bill se kaam karti hai, tay karti hai ki battery kaunse load chalayegi, battery aur zaroori solar ka size nikaalti hai, kisi bhi maker ki battery chunti hai, use aapke panel, feeder aur DG ke saath lagati aur jodti hai, Ingro EMS ke saath commission karti hai, aur warranty ke saalon tak maintain karti hai. Board, bank aur scheme ke appraisal ke liye aankde bhi hum taiyaar kar sakte hain. Ingro battery nahi banata; woh poori system design, integrate, commission aur maintain karta hai.
Sign karne se pehle kya poochhein
- Feeder ke ghanton ke baahar kaunse load chalenge (fan, fogger pump, cold room, grading line), aur garam din mein kitne ghante, likhit mein?
- Kya yeh sirf battery par cold room compressor aur fogger pump start kar degi, fan chalte hue?
- Feeder band hone par solar plant chalta rahega, aur export DISCOM ki limit ke andar rahega?
- Raat ko, pack-house mein koi na ho, tab feeder, battery aur DG ke beech apne aap kaise badlegi?
- Kaunsa kharcha PM-KUSUM, MIDH ya AIF loan mein aata hai, aur kya bank aur scheme ke documents aap taiyaar karenge?
- Cabinet kahan khada hoga, garmi, dhone ke paani aur khaad se door?
- Warranty kitne saal aur kitne cycle ki hai, harvest ke beech band ho jaye to kaun aayega, aur kitni jaldi?
Aage kaam ka
- Cold storage: bade store ke liye yahi sawaal
- Rooftop solar wali factory: cut aur zero export mein solar kyun rukta hai
- Kamzor gaon ke feeder par milk chilling centre
- Battery ya DG: poori tulna
- India mein battery system ki keemat
- India mein bikne wale BESS cabinet, specifications ke saath
- Solar inverter, tulna ke liye
- Turnkey battery systems: design to O&M from one team
FPO board aur farm manager ke sawaal
Kya agri feeder band hone par battery polyhouse ke fan aur fogger chala sakti hai?
Haan, agar saath chalne wale fan aur fogger pump ke hisaab se size ho aur inverter unhe start kar sake. Garam dopahar mein kitne ghante chalegi, yeh likhit mein maangiye.
Hamare pump ki bijli free hai. Kya battery paisa bachayegi?
Pump par nahi. Bachat pack-house se aati hai, jo aksar metered category par hota hai (Maharashtra mein LT IV(C) lagbhag ₹7.21 ek unit), aur diesel se, agar feeder ke baahar DG chalta hai.
Feeder band hote hi hamara solar kyun ruk jaata hai?
Grid-tied inverter jis grid ke saath chalta hai woh chala jaye to band ho jaata hai, dopahar ko bhi. Battery aur site ki apni supply banane wale inverter ke saath panel load chalate rehte hain.
Kya PM-KUSUM battery ka paisa deti hai?
Jo maujooda niyam humne dekhe unme nahi: woh solar pump aur solar plant ka paisa deti hai. March 2026 ki reports ke mutabik PM-KUSUM 2.0 mein battery par baat chal rahi thi, par koi notified niyam humein abhi nahi mila.
Kya battery hamare MIDH ya AIF project ka hissa ban sakti hai?
MIDH ke cost norms polyhouse, pack-house aur cold room ka paisa dete hain, battery ka nahi. Agriculture Infrastructure Fund FPO ke eligible infrastructure ke solarisation ko 3% interest subvention ke saath finance kar sakta hai; battery ginti hai ya nahi, yeh bank batayega.
Kya DG phir bhi chahiye?
Rakhiye. Battery feeder ke baahar ka roz ka gap sambhalti hai; DG lambi outage aur badli ke dinon ke liye rehta hai aur bahut kam ghante chalta hai.
Sources
- MSEDCL, letter to field offices on the three-phase supply schedule for Ag load-management feeders, July to September 2025 (30 June 2025): 8 hours by day or by night in weekly rotation; daytime only where feasible; MSKVY 2.0 solarised feeders
- MERC Mid-Term Review tariff order, Case No. 226 of 2022, as issued in MSEDCL Commercial Circular No. 341 (28 April 2023): LT IV(B) and LT IV(C) applicability, greenhouses and pre-cooling / cold storage under LT IV(C), floriculture and horticulture moved to LT IV(B)
- Maharashtra Electricity Regulatory Commission, MSEDCL review order, Case No. 75 of 2025 (25 March 2026): LT IV(B) and LT IV(C) tariffs for FY 2026-27
- The Week / PTI (3 September 2025): Mukhyamantri Baliraja free electricity scheme for agricultural pumps up to 7.5 HP, April 2024 to March 2029
- Outlook Business (19 February 2025): Karnataka's policy of seven hours of three-phase power daily for agricultural pump sets
- The Week / PTI (11 June 2025): Karnataka's KUSUM-C feeder solarisation for seven hours of daytime power to pump sets
- ETV Bharat (4 March 2026): KERC tariff revision; free power for pump sets up to 10 HP continues in Karnataka
- PIB, criteria and incentives under MNRE solar schemes (August 2024): PM-KUSUM Components A, B and C, CFA of 30% (50% in NE and hill states) of the solar pump or solar PV component
- Renewable Watch (25 January 2024): MNRE's amended PM-KUSUM guidelines, Component A plants of 500 kW to 2 MW, Component C individual and feeder-level solarisation
- KNN India (March 2026): Centre considers a battery storage component in PM-KUSUM 2.0
- Vision IAS summary of The Indian Express (30 March 2026): current PM-KUSUM has no battery provision; Ministry of Power suggests up to 4 hours, MNRE 2 hours
- National Horticulture Board, cost norms and pattern of assistance under MIDH: protected cultivation (50%, up to ₹56 lakh), pack house, integrated pack house, pre-cooling and staging cold room (35% general, 50% hilly and scheduled areas, credit-linked back-ended)
- Ministry of Agriculture & Farmers Welfare, Agriculture Infrastructure Fund revised scheme guidelines (January 2023): 3% interest subvention up to ₹2 crore, FPOs eligible, polyhouses and pack houses, solarisation of eligible infrastructure
In sites ko battery storage se fayda hua
Alag-alag sites, ek hi baat: apni solar aur green bijli zyada istemaal kijiye, bijli ka bill ghataiye, aur grid saath na de tab bhi kaam chalta rahe.
LiveAPAR Industries · Factory · 720 kW / 500 kWh batteryA factory whose process lines keep running through every dip in power.
- <1 ms
- response when the load jumps or the grid dips
- Zero
- gaps in power to the production lines
- End to end
- battery, PCS, controls and installation by one team
LiveEV charging hub · 260 kW / 580 kWh battery · IndiaElectric buses and cars keep charging, even when the grid is gone.
- 2.5×
- charging power from the same grid connection
- 1 s
- battery and PCS data, cell by cell
- Grid outage
- buses and cars still charge off the battery
UnderwaySolar + battery micro-grid · Melghat, MaharashtraA village without a grid. A solar and battery micro-grid that powers it.
- Village
- no grid connection
- Black start
- from standstill, no outside source
- 820
- homes on solar and battery
In testingIndustrial battery plant · Pune · 2.5 MW / 10 MWhTwo battery containers, two vendors, two languages. One EMS runs them as one plant.
- 2
- container makes, each with its own BMS protocol
- 1
- PCS and one EMS across both
- Hot-swap
- take a container out for service, plant keeps running
Apne polyhouse cluster ke baare mein bataiye
Jo pata hai bhejiye aur apne cluster par free expert salah lijiye. Ingro ka engineer aapke feeder ke ghante, unke baahar kya chalna chahiye, aur aapka solar dekhta hai, aur poora solution keemat aur payback ke saath nikaalta hai, aise roop mein jo board aur bank ke saamne rakh sakein. Aage badhein to baaki sab hamari team ek turnkey project ki tarah sambhalti hai: design, kisi bhi maker ka saamaan, installation, commissioning, Ingro EMS aur maintenance.
Aage kya hoga: hum ek working day mein phone ya WhatsApp par jawab dete hain. Abhi site visit ki zaroorat nahi, aur koi paisa nahi lagta.