EMS for 1 MW / 2 MWh Battery StorageMegawatt storage for a factory, a park or a depot.

A 1 MW / 2 MWh battery is where heavy industry, industrial parks and large EV depots start. At this size the EMS has to juggle the demand limit, the ToD window, solar, DG and backup every few seconds.

Large C&I and plants

1 MW / 2 MWh

Power
1 MW
Energy
2 MWh
At full power
about 2 hours
Format
Eight cabinets, or a container with a 1 MW PCS
Ingro EMS-CIIngro EMS-EVAny battery, BMS or PCS
The short answer

For a 1 MW / 2 MWh BESS, Ingro EMS is the energy management system that runs the battery against the site's contract demand, ToD tariff, solar and diesel generators, and keeps a backup reserve. It runs a row of cabinets or a container as one battery, with any maker's battery and PCS, and keeps control on site with no internet needed.

Ingro does not make the battery. The cabinet or container can be any maker's, with any BMS and PCS; Ingro EMS is the controller and software that decides when it charges, discharges or holds.

The battery

What a 1 MW / 2 MWh BESS Usually Is

What a battery of this size usually looks like on an Indian site.

  • Usually eight 125 kW / 261 kWh cabinets (about 1 MW / 2.1 MWh), or a container with a 1 MW PCS.
  • Connected at HT through a transformer, or at the LT bus in sections.
  • Often alongside a megawatt of solar and several DG sets.
Where it works

Where a 1 MW / 2 MWh Battery Earns Its Keep

The sites that most often install a 1 MW / 2 MWh battery.

Steel, textile and process plants

Hold the contract demand through large motor and furnace swings.

Industrial parks

One battery that trims the park's peak at the common connection.

EV bus and fleet depots

Overnight charging peaks carried by the battery instead of a larger connection.

Want an engineer to call you?

Leave your details. An Ingro engineer gets back to you within one business day, no obligation.

Or tell us about your site ↓
What Ingro EMS does

Ingro EMS on a 1 MW / 2 MWh Battery

The battery stores energy and the PCS converts it. The EMS decides what it earns, every control cycle.

Contract demand

Is the demand charge held?

Fast discharge against the main meter keeps the 15- or 30-minute peak under the limit.

ToD and solar

Is energy moved to the right hours?

Charge from solar and off-peak power, discharge in the peak window.

Backup and DG

What runs the plant in an outage?

Critical feeders on the battery first; DG sets start in order only if needed.

Proof

Can finance see the savings?

Monthly savings, M&V and bill reconciliation reports, from metered data.

Connecting it

Which Ingro EMS Runs This Size

Ingro EMS connects to the BMS and PCS, the HT and feeder meters, solar inverters and DG controllers. It speaks Modbus TCP, Modbus RTU over RS485, SunSpec, IEC 61850, DNP3 and OPC-UA, plus dry contacts, digital I/O and aggregator gateways. Ingro EMS is deployed on site (offline), in the cloud, or as a hybrid of the two. In on-site and hybrid deployments, site control continues with no internet connection.

Building batteries of this size? Ingro EMS for integrators, EPCs and pack makers · Every BMS, PCS and protocol

Common questions

EMS for a 1 MW / 2 MWh BESS, Answered

3 questions

Ingro EMS-CI for factories and industrial parks, or EMS-EV for charging depots. It runs a row of cabinets or a container as one battery against the contract demand, ToD tariff, solar and DG.

Send the battery size and make, the PCS, a year of electricity bills or the load profile, and what the battery must do (peak shaving, backup, solar, DG, dispatch). An engineer replies within one business day with a scope of supply.

Control response is specified per project — sub-millisecond, 4 ms, 10 ms or 20 ms — to match the site's requirement.

Still have a question?

Share details of your site, hardware and tariff or tender, and an engineer will answer it.

Every size

Ingro EMS for Every Battery Size

One controller and one console, from a home battery to a grid-scale plant.

Compare all sizes

Running a 1 MW / 2 MWh Battery? Put Ingro EMS on It.

Send the battery and what it must do. An engineer replies within one business day.

You send
  • 1The battery size and make, and the PCS
  • 2A year of bills or the load profile
  • 3What the battery must do: peak, backup, solar, DG or dispatch
We return
  • An EMS scope of supply
  • Which Ingro EMS package fits, and how it connects
  • Or a complete BESS proposal, if you hand over the plant

Get a Proposal for Your 1 MW / 2 MWh Battery

Tell us the battery, the PCS and what it must do. An engineer replies within one business day with the EMS scope and the package that fits.

What are you looking for?

An engineer replies within one business day. Bills, drawings or data files can go in reply to that email, or to contact@ingroenergy.com. Privacy policy