For a 2.5 MW / 5 MWh BESS container, Ingro EMS is the plant controller that runs the container and its PCS against the site's demand, tariff, solar or dispatch schedule. It works with any maker's container and BMS, and runs containers from different makers as one plant — as it does at JSW Energy's Pune site, where two 5 MWh containers from two makers sit behind one PCS.
Ingro does not make the battery. The cabinet or container can be any maker's, with any BMS and PCS; Ingro EMS is the controller and software that decides when it charges, discharges or holds.
What a battery of this size usually looks like on an Indian site.
Choosing the battery? 5 MWh container makers in the Ingro directory
The sites that most often install a 2.5 MW / 5 MWh battery.
Contract demand, ToD and backup at megawatt scale.
Store curtailed energy and deliver it in the evening peak.
Peak support and shifting for a feeder or a group of consumers.
Leave your details. An Ingro engineer gets back to you within one business day, no obligation.
The battery stores energy and the PCS converts it. The EMS decides what it earns, every control cycle.
Yes. At JSW Energy, Pune, two 5 MWh containers from two makers run as one 2.5 MW / 10 MWh plant.
The plant keeps running on the other container while one is serviced.
The EMS sets the PCS power every control cycle against the meter, tariff, solar or schedule.
Availability, energy throughput, battery health and dispatch reports.
Ingro EMS connects to each container's BMS, the PCS, the MV meters and, where present, the solar plant controller. It speaks Modbus TCP, Modbus RTU over RS485, SunSpec, IEC 61850, DNP3 and OPC-UA, plus dry contacts, digital I/O and aggregator gateways. Ingro EMS is deployed on site (offline), in the cloud, or as a hybrid of the two. In on-site and hybrid deployments, site control continues with no internet connection.
Building batteries of this size? Ingro EMS for integrators, EPCs and pack makers · Every BMS, PCS and protocol
2.5 MW / 10 MWh: two 5 MWh containers from two makers behind one PCS, run as one plant.
4 questions
A plant controller that reads the container's BMS and PCS and runs it against the site's demand, tariff, solar or dispatch schedule. Ingro EMS does this with any maker's container, and runs a 2.5 MW / 10 MWh plant of two 5 MWh containers at JSW Energy, Pune.
Yes. At JSW Energy, Ingro replaced the existing EMS, hardware and software. See Smart Retrofit for batteries already in service.
Yes. Ingro EMS reads each BMS in its own protocol. At JSW Energy the second container came from a different maker and runs with the first as one plant.
Send the battery size and make, the PCS, a year of electricity bills or the load profile, and what the battery must do (peak shaving, backup, solar, DG, dispatch). An engineer replies within one business day with a scope of supply.
Still have a question?
Share details of your site, hardware and tariff or tender, and an engineer will answer it.
One controller and one console, from a home battery to a grid-scale plant.
Send the battery and what it must do. An engineer replies within one business day.
Tell us the battery, the PCS and what it must do. An engineer replies within one business day with the EMS scope and the package that fits.