EMS for Grid-Scale BESS, 10 MW and AboveDispatch, grid code and the records a tender pays on.

From 10 MW up, the battery is grid infrastructure. The EMS executes the dispatch schedule, answers the grid code and keeps the availability record the owner is paid against.

Grid-scale

10 MW+ / 10 MWh+

Power
10 MW+
Energy
10 MWh+
At full power
1 to 4 hours
Format
A container yard at a substation
Ingro EMS-GSIngro EMS-REAny battery, BMS or PCS
The short answer

For a grid-scale BESS of 10 MW and above, Ingro EMS-GS is the plant controller that executes dispatch schedules and grid-code response at the substation and keeps the availability, cycle and battery-health records a storage tender pays on. It runs any maker's containers and PCS. Ingro EMS has run Tata Power-DDL's 10 MW / 10 MWh plant at Rohini — India's first grid-scale BESS — for over two years, with 124 PCS units under one controller.

Ingro does not make the battery. The cabinet or container can be any maker's, with any BMS and PCS; Ingro EMS is the controller and software that decides when it charges, discharges or holds.

The battery

What a 10 MW+ / 10 MWh+ BESS Usually Is

What a battery of this size usually looks like on an Indian site.

  • A yard of containers, typically 5 MWh each, with PCS and MV skids.
  • Connected at 33 kV or above through a substation, with SCADA and the utility's or SLDC's control link.
  • Durations from one to four hours; tenders increasingly ask for two or four.
Where it works

Where a 10 MW+ / 10 MWh+ Battery Earns Its Keep

The sites that most often install a 10 MW+ / 10 MWh+ battery.

Distribution substations

Peak support and deferring a transformer or feeder upgrade.

Tendered standalone storage

Charged and discharged to the buyer's schedule, paid on availability.

Renewable plants

Firm and dispatchable solar or wind under a storage tender.

Want an engineer to call you?

Leave your details. An Ingro engineer gets back to you within one business day, no obligation.

Or tell us about your site ↓
What Ingro EMS does

Ingro EMS on a 10 MW+ / 10 MWh+ Battery

The battery stores energy and the PCS converts it. The EMS decides what it earns, every control cycle.

Dispatch

Does it follow the schedule?

The EMS executes the day-ahead and real-time schedule from the buyer or SLDC.

Grid code

Does it answer the grid?

Frequency and voltage response at the response time the connection agreement sets.

Availability

Can the owner prove it?

Monthly availability, cycle and battery-health records, in the form the tender asks for.

Scale

How many units can one EMS run?

At Rohini, 124 PCS units run under one Ingro EMS.

Connecting it

Which Ingro EMS Runs This Size

Ingro EMS-GS connects to the container BMS, every PCS, the substation meters and protection, SCADA and the dispatch link. It speaks Modbus TCP, Modbus RTU over RS485, SunSpec, IEC 61850, DNP3 and OPC-UA, plus dry contacts, digital I/O and aggregator gateways. Ingro EMS is deployed on site (offline), in the cloud, or as a hybrid of the two. In on-site and hybrid deployments, site control continues with no internet connection.

Building batteries of this size? Ingro EMS for integrators, EPCs and pack makers · Every BMS, PCS and protocol

Common questions

EMS for a 10 MW+ / 10 MWh+ BESS, Answered

4 questions

A plant controller that executes dispatch schedules and grid-code response and keeps the availability records the tender pays on. Ingro EMS-GS does this, and runs Tata Power-DDL's 10 MW / 10 MWh plant at Rohini.

Yes. Ingro supplies the EMS to EPCs and integrators bidding storage tenders, or delivers the BESS turnkey. See EMS for grid-scale BESS tenders.

Yes. It has run India's first grid-scale BESS, Tata Power-DDL's 10 MW / 10 MWh plant at Rohini, for over two years, with 124 PCS units under one controller.

Send the tender or the plant size, the battery and PCS make, and the dispatch and grid-code requirements. An engineer replies within one business day with an EMS scope.

Still have a question?

Share details of your site, hardware and tariff or tender, and an engineer will answer it.

Every size

Ingro EMS for Every Battery Size

One controller and one console, from a home battery to a grid-scale plant.

Compare all sizes

Running a 10 MW+ / 10 MWh+ Battery? Put Ingro EMS on It.

Send the battery and what it must do. An engineer replies within one business day.

You send
  • 1The battery size and make, and the PCS
  • 2A year of bills or the load profile
  • 3What the battery must do: peak, backup, solar, DG or dispatch
We return
  • An EMS scope of supply
  • Which Ingro EMS package fits, and how it connects
  • Or a complete BESS proposal, if you hand over the plant

Get a Proposal for Your 10 MW+ / 10 MWh+ Battery

Tell us the battery, the PCS and what it must do. An engineer replies within one business day with the EMS scope and the package that fits.

What are you looking for?

An engineer replies within one business day. Bills, drawings or data files can go in reply to that email, or to contact@ingroenergy.com. Privacy policy