Tata Power-DDL · Rohini, Delhi
10 MW / 10 MWh, India's first grid-scale BESS
- 2019
Commissioned at Tata Power-DDL's Rohini substation in Delhi: India's first grid-scale battery, 10 MW / 10 MWh.
- 2023
The original control system could not manage the uneven ageing of batteries and inverters. The recommendation was to replace the whole installation.
- 2024
Ingro replaced the EMS, not the hardware: all 124 power conversion units integrated under one controller, and the plant run under Ingro O&M.
- 2026
Tata Power-DDL issued performance certificates for two consecutive annual terms and renewed the mandate.
- PCS units under one Ingro EMS
- 124PCS units under one Ingro EMS
- lower annual degradation
- ~41%lower annual degradation
- longer usable life, same batteries
- ~70%longer usable life, same batteries
The plant returned to full operation without a single new battery.